Search

Your search for "" found 8626 Hits

Issue 02/2016 Results of recent research

Simplified rules for masonry structures in German ­earthquake regions –

The presentation is related to recent tendencies and strategies in the European and German code development. In addition to the remarkable modifications in the fields of seismic hazard and description...

more
Issue 02/2016 Standardisation und approvals

Consequences of the judgement of the European Court of Justice for small wastewater treatment plants and their users –

All standards for small wastewater treatment plants are still in process and it can be assumed that the judgement of the European Court of Justice has some influence on the content of the stan-dard EN...

more
Issue 02/2016 How to prevent and assess defects?

Edge strength of concrete products –

Frequently occurring defects on concrete block ­pavements Many of the claims that arise in connection with concrete block pavements are concentrated on very few causes of damage. Among them, aside...

more
Issue 02/2016 Structurally effective facing shell and core layer

Loadbearing behavior of slender sandwich walls ­subjected to vertical loading –

Sandwich walls and core-insulated double walls with increasingly thick thermal insulation layer are widely used in building practice. They enable cost-effective and convincing energy-saving solutions...

more
Issue 02/2016 Specifications and practical examples

Structural precast construction in seismic areas

Design and construction in German earthquake areas had previously been governed by DIN 4149 [1]. This standard will be superseded by DIN EN 1998-1 (Eurocode 8) [2, 3] and the corresponding...

more
Issue 02/2016 Technical implementation and site logistics

Inner-city construction using large precast elements for IKEA Hamburg-Altona

Grosse Bergstrasse, Hamburg-Altona The building at Grosse Bergstrasse is the first multi-story, inner-city IKEA store in Hamburg-Altona. IKEA considers this store to be a pilot project. Concreting...

more
Issue 02/2016 Refurbishment of the Rhine embankment with concrete step cascade

Architectural concrete for Cologne’s Rhine Boulevard

In Köln-Deutz, an inner-district of Cologne, the Rhine Boulevard, as it is popularly known, is currently under reconstruction. The project involves a section of the Rhine embankment about 300 m...

more
Issue 02/2016 Latest requirements

Sealing systems for pipes and manholes –

In times of growing awareness regarding environmental protection, the parties issuing an invitation to tender also increase the requirements on production and assembly of sewer and manhole parts....

more
Issue 02/2016 Shear force resistance under longitudinal tension

Reinforced concrete floors with integrated cavities

In building construction, reinforced concrete floors are frequently used as installation space for building services. Horizontal line distribution is one of the major causes for cross-sectional...

more
Issue 02/2016 Electric transmission lines with underground high-voltage cables -

Alternative systems for an energy turnaround

For those responsible only a few years remain to implement the decision taken by politics on June 11, 2011 on a gradual abandonment of nuclear energy. The last eight of the presently operated nuclear...

more

Ihre Suche nach "" :

5932 Treffer in "AT Minerals"

9031 Treffer in "Bundesbaublatt"

8626 Treffer in "Betonwerk + Fertigteil-Technik"

7832 Treffer in "bauhandwerk"

1212 Treffer in "Brandschutz"

1314 Treffer in "Computer Spezial"

5547 Treffer in "dach+holzbau"

15528 Treffer in "Deutsche BauZeitschrift"

5871 Treffer in "FACILITY MANAGEMENT"

11462 Treffer in "Kälte Klima Aktuell"

6085 Treffer in "metallbau"

1690 Treffer in "recovery"

12215 Treffer in "SHK Profi"

13637 Treffer in "tab - Das Fachmedium der TGA-Branche"

12331 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2090 Treffer in "tunnel"

5808 Treffer in "Zement Kalk Gips"

3556 Treffer in "Ziegelindustrie International"