Search

Your search for "" found 8155 Hits

Issue 04/2020 PRECAST SOFTWARE ENGINEERING

For highest efficiency in planning for 30 years now

This year, Precast Software Engineering GmbH based in the state of Salzburg is celebrating even three anniversaries: The team has been developing solutions for the precast concrete industry for 30...

more
Issue 04/2020 Submitted by: Primo

Automated manufacturing process in the precast factory

Primo has managed to develop a „magnet magazine“ allowing positioning of several magnets on as well as their later removal from the formwork table in a fully automated process or manually. Hence, the...

more

Vollert is starting a cooperation with the Technical University of Kenya in Nairobi

Modern architecture and new building systems create affordable housing for many people in Africa. At the same time, it will become an important job machine for many countries. To this end, the German...

more

New date for BIBM Kongress: 15th to 17th November 2020

This years BIBM Congress is postponed. After first planning to postpone to the second half of October, we could move the event succesfully to 15th to 17th of November 2020. All stand reservations as...

more

New date for wire and Tube Düsseldorf: 7 to 11 December 2020

The world's leading international trade fairs for the wire, cable, tube and pipe industry, wire and Tube, will take place from 7 to 11 December 2020 atDüsseldorf Fairgrounds. This is Messe...

more

First DornerBatch in North Africa

Steel-Kamet is a leading developer in the construction materials industry and in the power plant, gas and oil field sector. Based in Finland, Steel-Kamet has been working with Dorner Electronic for...

more

BIM design: KP1 and Trimble sign a strategic partnership agreement

KP1 Group, French leader of precast building systems and Trimble Solutions France, provider of Tekla Structures software and other construction solutions, have signed a strategic partnership...

more

Veronafiere postpones SaMoTer, Asphaltica and LetExp

Date changes decided by the Board of Directors: the timing of set-up and logistic operations for these events are incompatible with national and regional dispositions for Covid-19. The Board of...

more
Issue 03/2020 Submitted by: BT innovation

Innovation: BT Q anchor for building with thin walls

The BT Q anchor was developed to transfer maximum possible shear and tensile forces into concrete elements. It is an embedded part and is installed prior to casting and is then embedded, An approval...

more
Issue 03/2020

Method and semi-finished element for manufacture of a concrete double-wall element

(10) DE 10 2018 124 980 B3 (45) 23.01.2020(57) Die Erfindung betrifft ein Verfahren zur Herstellung eines Beton-Doppelwand-elements mit zwei voneinander beabstandeten Betonschalen (2a, 2b), die über...

more

Ihre Suche nach "" :

5512 Treffer in "AT Minerals"

8734 Treffer in "Bundesbaublatt"

8155 Treffer in "Betonwerk + Fertigteil-Technik"

7530 Treffer in "bauhandwerk"

1145 Treffer in "Brandschutz"

1153 Treffer in "Computer Spezial"

5237 Treffer in "dach+holzbau"

14856 Treffer in "Deutsche BauZeitschrift"

5564 Treffer in "FACILITY MANAGEMENT"

10823 Treffer in "Kälte Klima Aktuell"

5725 Treffer in "metallbau"

1437 Treffer in "recovery"

11757 Treffer in "SHK Profi"

13115 Treffer in "tab - Das Fachmedium der TGA-Branche"

12046 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2003 Treffer in "tunnel"

5684 Treffer in "Zement Kalk Gips"

3433 Treffer in "Ziegelindustrie International"