In the course of ongoing digitalization in the precast construction industry, three-dimensional building models have almost become standard in structural design in the meantime. These models not only...
In the absence of daylight, subway stations quickly become dark and spooky places. The planners of the new Karlsruhe Metro, the Munich office of Allmann Sattler Wappner Architects, wanted to counter...
Approximately 10 % of the population in Germany is not connected to a communal sewer system and/or to a central sewage treatment plant. They must therefore implement decentral sewage treatment...
Retrofit kits for sewage treatment technology are key components of the industry and are preferably installed in suitable concrete tanks. As a product, they are therefore subject to various...
The judgment issued by the European Court of Justice on 16 October2014 in Case C-100/13 means that, since November 2016, the DIBt has no longer been in a position to grant national technical approvals...
Most of the production processes required for building the unique shell roof in the Stuttgart 21 project were developed from scratch, thus extending building feasibility limits for extremely complex...
In the summer of 2008, we (B. Hullak and J. Rannow) decided to turn two small architectural offices into one larger firm. Meanwhile, after numerous loops, tests, successes and failures, and as a...
Pavements in outdoor installations are subject to requirements that follow from the specific characteristics of each installation location and from the actual foreseeable loading both during...
The eight-story building housing the chancery of the German Embassy in Paris on Avenue Franklin D. Roosevelt was built from 1960 to 1963 as a reinforced-concrete frame structure. It was completely...
From the 15th to the 19th October, the seventh edition of the Technical Mission in Italy took place, an international event organized by CSG Engineering and open to all precast professionals and...