Search

Your search for "" found 8111 Hits

Issue 01/2019

Method and device for producing a paving stone

(10) WO 2018/202831 Al(22) 04.05.2018(43) 08.11.2018(57) Das Verfahren zur Herstellung eines Pflas­tersteins weist die folgenden Verfahrensschritte auf: a) Herstellen ei­ner Betonmischung (21) in...

more
Issue 01/2019

Universal laying device for large-sized concrete slabs, lawn edging blocks, concrete grass blocks and similar

(10) DE 20 2018 003 894 U1 (22) 23.08.2018(45) 08.11.2018(57) Universelle Verlegevorrichtung (Fig. 1, Pos.2 und Fig.2) dadurch gekennzeichnet, dass mit einer handelsüblichen Sackkarre, (Fig.1, Pos.1)...

more
Issue 01/2019

Lifting equipment for a precast concrete element

(10) DE 20 2017 104 218 U1(22) 14.07.2017(45) 22.11.2018(57) Hebevorrichtung (1) für ein Betonfertig­teil, mit mindestens einem ersten länglichen Querträger (2, 3) der eine Oberseite (2c, 3c) und eine...

more
Issue 01/2019

Formwork for manufacturing a concrete structure, formwork system for forming such a formwork ...

(10) US 2018/0320333 Al (22) 27.10. 2016(43) 08.11.2018 (57) A formwork for manufacturing a concrete structure which is composed of one or several folding portions, provided with one or several hollow...

more
Issue 01/2019 RWTH AACHEN/ITA

World premiere of CON-TEXTURES sculpture

The world‘s first large-format carbon concrete sculpture CON-TEXTURES was unveiled on 30 November 2018 at one of the most important European textile conferences, the Aachen-Dresden-Denkendorf...

more
Issue 01/2019

Fixing rail and concrete member with fixing rail 

(11) EP 3 401 454 Al(22) 08.05.2017(43) 14.11.2018 Patentblatt 2018/46(57) Eine Befestigungsschiene (1) zur Einbettung in ein Betonbauteil (20) besitzt einen Schienenrücken (2), zwei einander...

more
Issue 01/2019 BETONWERK BIEREN

Pipes and manholes for trenchless jacking in Hanover

Hans-Böckler-Allee, a street in Hanover also known for its frequent traffic jams, is currently being upgraded in conjunction with the new Continental headquarters under construction in this area. As...

more
Issue 01/2019

Rigid connection structure between upper precast concrete column and lower precast concrete column ...

(10) US 2018/0320363 Al(22) 08.09.2017(43) 08.11.2018(57  Provided is a rigid connection structure including: a lower PC column having column concrete, a lower column plate disposed on top of the...

more
Issue 01/2019 DBV

Heft 44 on fresh composite concrete systems – state and recommendations

The German Society for Concrete and Construction Technology (DBV) has extended its series of publications by DBV-Heft 44 “Frischbetonverbundsysteme (FBV-Systeme) – Sachstand und...

more
Issue 01/2019

Double wall and transport anchor for a double wall

(10) DE 10 2011 055 142 B4 (22) : 08.11.2011(43) 09.08.2012 (45) 29.11.2018(57) Transportanker (6) für eine eine erste Schale (9) und eine zweite Schale (10) aufweisende Doppel­wand (1) mit einem...

more

Ihre Suche nach "" :

5438 Treffer in "AT Minerals"

8647 Treffer in "Bundesbaublatt"

8111 Treffer in "Betonwerk + Fertigteil-Technik"

7478 Treffer in "bauhandwerk"

1135 Treffer in "Brandschutz"

1136 Treffer in "Computer Spezial"

5150 Treffer in "dach+holzbau"

14769 Treffer in "Deutsche BauZeitschrift"

5544 Treffer in "FACILITY MANAGEMENT"

10713 Treffer in "Kälte Klima Aktuell"

5684 Treffer in "metallbau"

1394 Treffer in "recovery"

11685 Treffer in "SHK Profi"

12980 Treffer in "tab - Das Fachmedium der TGA-Branche"

12001 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2001 Treffer in "tunnel"

5683 Treffer in "Zement Kalk Gips"

3416 Treffer in "Ziegelindustrie International"