Search

Your search for "" found 8189 Hits

Issue 02/2019 DICAD

New version 2019: Strakon builds bridges

In a figurative sense, Strakon already built bridges in its earlier versions – i.e., between 2D, 3D and BIM. Thanks to the smooth transitions from object-oriented design to 3D construction and the BIM...

more
Issue 02/2019

New concrete paving plant for TriCircle Pavers in Bartow/Florida

TriCircle Pavers is a family company and has been supplying paving products to Florida based customers for more than 35 years from facilities in Fort Myers and Bartow, Florida. With a long-term...

more
Issue 02/2019 Developments and trends in mechanical engineering

Future challenges in machinery construction and plant engineering for the concrete industry

Suppliers for machinery construction and plant engineering for the concrete industry essentially are facing the same challenges as other companies in this sector. Here, the following criteria industry...

more
Issue 02/2019 PRETEC DENMARK/EUROBEND

New welding machine for Pretec Denmark

In addition to the offered broad range of welding lines for the production of standard and specialized construction mesh, engineering, precast or architectural mesh, Eurobend GmbH offers a full range...

more
Issue 02/2019

Reduced-thickness reinforced concrete pavement

(10) WO 2018/224707 Al(22) 06.06.2018(43) 13.12.2018(57) The invention provides a pavement (11) formed by an assembly of concrete slabs (13) of thickness H, each slab (13) comprising a plurality of...

more
Issue 02/2019

Prefabricated concrete slab floor and method of fabricating the same

(10) US 2018/0347191 Al (22) 01.06.2017(43) 06.12.2018(57) The present invention relates to a composite floor, typically a wood/concrete composite floor. The composite floor com­prises a support...

more
Issue 02/2019

Connector for precast concrete structures

(10) US 2018/0347179 Al (22) 31.05.2018(43) 06.12.2018(57) An apparatus, system, and method is provided to connect precast concrete panels to a structural member. The connec­tor can have a receiving...

more
Issue 02/2019

Double-walled installation pit of wall elements

(11) EP 3 412 848 A2(22) 04.06.2018(43) 12.12.2018 Patentblatt 2018/50(57) Die Erfindung betrifft eine Montagegrube (1), insbesondere Fertigteil-Montagegrube, umfassend ei­nen in eine Bodenausnehmung...

more
Issue 02/2019

Connection and alignment of building elements

(11) EP 3 409 854 A1(22) 04.06.2018(43) 05.12.2018 (57) A linkage assembly enables an interior building element, such as a concrete slab or wooden joist, to be connected to and aligned with an...

more
Issue 02/2019

Molded block for garden, landscape and road construction, in particular planting block ...

(10) DE 20 2018 106 167 U1(22) 29.10.2018(45) 20.12.2018(57)  Formstein (10, 10a, 10b) für den Garten-, Landschafts- und Straßenbau, insbesondere Pflanz­stein (10, 10a, 10b) oder Pflanzkübelstein, mit...

more

Ihre Suche nach "" :

5515 Treffer in "AT Minerals"

8735 Treffer in "Bundesbaublatt"

8189 Treffer in "Betonwerk + Fertigteil-Technik"

7531 Treffer in "bauhandwerk"

1146 Treffer in "Brandschutz"

1154 Treffer in "Computer Spezial"

5240 Treffer in "dach+holzbau"

14860 Treffer in "Deutsche BauZeitschrift"

5599 Treffer in "FACILITY MANAGEMENT"

10827 Treffer in "Kälte Klima Aktuell"

5734 Treffer in "metallbau"

1437 Treffer in "recovery"

11762 Treffer in "SHK Profi"

13123 Treffer in "tab - Das Fachmedium der TGA-Branche"

12050 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2003 Treffer in "tunnel"

5725 Treffer in "Zement Kalk Gips"

3433 Treffer in "Ziegelindustrie International"