Related articles:

Issue 04/2014

Precast concrete post tensioned segmented wind turbine tower

(10) WO 2014/021927 A2 (22) 02.08.2013 (43) 06.02.2014 (71) LOCKWOOD, James, D. [US/US]; 5500 Flatiron Pkwy, Suite 100, Boulder, CO 80301 (US) (84) ARIPO (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD,...

more
Issue 09/2023

Grouting-Free-Dry-Type prestressed bolt segment-assembled prefabricated concrete tower

(10) EP4202209A1 (22) 17.06.2021 (43) 28.06.2023 (57) The present invention discloses a grouting-free dry-type prestressed bolt segment-assembled prefabricated concrete tower, comprising a top steel...

more
Issue 01/2023

Concrete foundation for a wind turbine tower and method for installing same

(10) EP 4 079 970 A1 (22) 22.12.2020 (43) 26.10.2022 (57) A precast concrete foundation (100; 200) for a wind tower (140; 240), comprising a slab (110, 120; 210, 220a, 220b), a pedestal (130; 230) and...

more
Issue 03/2013 Peikko Deutschland GmbH

Taunus Tower – with precast concrete components quickly all the way up

The joint-venture partners of Tishman Speyer and Commerz Real AG will complete the TaunusTower by the end of 2013. The office building, located at the corner of Neue Mainzer Strasse and Taunustor...

more