Method for installing a hollow concrete tower made from more than one segment and one such hollow concrete tower

(11) EP3212863 A1

(57) Keine Zusammenfassung verfügbar Kir EP3212863 (A1) Zusammenfassung der korrespondierenden Patentschrift W02016066345 (A1)

Method for installing a hollow concrete tower comprising the following steps: a) arranging a platform on a site; b) arranging on said platform at least one partial full-segment mold in a position such that the segment axis of the segment being cast in said mold is substantially vertical; c) pouring concrete inside said arranged partial mold(s); d) allowing the poured concrete to set to working strength, generating corresponding segment(s); e) removing the arranged mold(s) with concrete set to working strength, to leave the corresponding segment(s) exposed; f) assembling said corresponding exposed segment(s); and g) optionally, repeating steps b) - f) at least once.

(71) BYO TOWERS S L [ES] ± (BYO Towers, S.L)

(73) DIEZ CORNEJO ALFONSO [ES] ± (DIEZ CORNEJO, Alfonso)

x

Related articles:

Issue 11/2019

A method of manufacturing precast concrete segments for a tower

(10) AU2017410098 (A1) (22) 26.09.2019 (43) 18.04.2017 (57) Concrete segments destined to form all or part of a tower (2), the segments being destined to be superimposed within the tower. The method...

more
Issue 04/2018

Tower segment, tower, wind energy plant as well as method for manufacture of a tower segment and for the connection of tower segments

(10)  DE 10 2016 114 661 A1 (22)   08.08.2016 (43) 08.02.2018 (57) Die Erfindung betrifft ein Turmseg­ment eines Turms ei- ner Windenergieanlage, einen Turm­abschnitt einer Windenergieanlage,...

more
Issue 06/2018

Structural concrete tower and assembly method

(10) W02018068117 A1 (22) 10.10.2017 (43) 19.04.2018 (57) A structural concrete tower and assembly method, said tower comprising the superpositioning of a first (21) and a second (22) tower segment,...

more
Issue 01/2023

Concrete foundation for a wind turbine tower and method for installing same

(10) EP 4 079 970 A1 (22) 22.12.2020 (43) 26.10.2022 (57) A precast concrete foundation (100; 200) for a wind tower (140; 240), comprising a slab (110, 120; 210, 220a, 220b), a pedestal (130; 230) and...