A method of manufacturing precast concrete segments for a tower

(10) AU2017410098 (A1)

(22) 26.09.2019

(43) 18.04.2017

(57) Concrete segments destined to form all or part of a tower (2), the segments being destined to be superimposed within the tower. The method comprises, for at least a first segment and a second segment destined to be adjacent in the tower, the first segment being destined to be located beneath the second segment, forming said first and second segments using at least one mold comprising a first portion (Ti) and a second portion (Bi) respectively configured to define all or part of an upper face, respectively a lower face of the segment formed therein, the first portion of the mold used for forming the first segment and the second portion (Bi) of the mold (Mi) used for forming the second segment exhibiting respective geometries of complementary shapes.

(71) SOLETANCHE FREYSSINET + (Soletanche Freyssinet)

(73) LEBON JEAN-DANIEL + (Lebon, Jean-Daniel)

x

Related articles:

Issue 06/2018

Structural concrete tower and assembly method

(10) W02018068117 A1 (22) 10.10.2017 (43) 19.04.2018 (57) A structural concrete tower and assembly method, said tower comprising the superpositioning of a first (21) and a second (22) tower segment,...

more
Issue 01/2017

Method of constructing a tower of concrete segments

(11) EP 3 095 569 A1 (22) 04.02.2015 (43) 23.11.2016 Bulletin 2016/47 (57) Method of constructing a tower with concrete tower segments. After casting and hardening of a first tower segment, a second...

more
Issue 04/2018

Tower segment, tower, wind energy plant as well as method for manufacture of a tower segment and for the connection of tower segments

(10)  DE 10 2016 114 661 A1 (22)   08.08.2016 (43) 08.02.2018 (57) Die Erfindung betrifft ein Turmseg­ment eines Turms ei- ner Windenergieanlage, einen Turm­abschnitt einer Windenergieanlage,...

more
Issue 06/2020

Pre-cast segment for tunnels and method for producing...

(10)US 2020/0116021 A1 (22) 15.05. 2018 (43) 16.04.2020 (57) Pre-cast segment for a reinforced concrete tunnel includes an arcuate structure having reinforcement and a cement agglomerate to cover...

more
Issue 07/2019

Climbing formwork and method for erection of a concrete structure

(10) US 2019/0145111 Al (22) 07.04.2017 (43) 16.05.2019 (57) A climbing formwork and a method for erection of a concrete structure by successively casting a plurality of casting segments, the climbing...