Search

Your search for "" found 8462 Hits

Issue 11/2020

Method of casting

(10) WO 2020/107060 Al(22) 22.11.2019(43) 04.06.2020(57) A bed of recyclable molding casting medium is first laid down and then cut away to produce a mold for a concrete component or an element of...

more
Issue 11/2020

Prefabricated module interconnection for modular building

(10) WO 2020/098805 Al(22) 16.11.2019(43) 22.05.2020(57) An attachment between adjacent concrete-based prefabricated modules in a single storey of a multi-storey modular building is provided. A first...

more
Issue 11/2020

System and method for heating a concrete slab and for preventing accumulation of meltable precipitation thereon

(10) WO 2020/097718 Al(22) 12.11.2019(43) 22.05.2020(57) There is described a system for preventing accumulation of meltable precipitation on a surface. The system generally has: a concrete slab...

more
Issue 11/2020

Method for producing precast concrete components with the aid of a casting mold

(10) WO 2020/093078 Al(22) 05.11.2019(43) 14.05.2020(57) Es wird ein Verfahren zur Herstellung von Betonfertigteilen mit Hilfe von Gussformen (6) beschrieben. Um ein Verfahren dahingehend zu...

more
Issue 11/2020

Composite foam and concrete wall and method constructing the same

(10) US 2020/0157814 Al (22) 22.01.2020(43) 21.05.2020(57) A composite foam and concrete wall includes a foam layer having a top surface, a bottom surface, a left wall surface and a right wall surface...

more
Issue 11/2020

Tower foundation with concrete box girder beams

(10) US 2020/0157760 Al(22) 24.01.2020(43) 21.05.2020(57) Concrete foundations for supporting towers and other struc­tures under heavy cyclical loads are described. Some or all of the major concrete...

more
Issue 11/2020

Lifting anchor assembly for precast concrete structures

(10) US 2020/0149302 Al (22) 19.01.2020(43) 14.05.2020(57) A lifting anchor assembly that is configured to be embedded in a tilt-up concrete structure includes an anchor member that has a central...

more
Issue 11/2020

Concrete structure

(11) EP 3 647 499 A1(22) 15.10.2019(43) 06.05.2020 Bulletin 2020/19(57) Concrete structure comprising at least one parallelepipedic concrete block (1) that includes two oppos­ing bases (1a, 1b), two...

more
Issue 11/2020

Precast concrete element and loading system

(10 DE 10 2018 129 016 A1 (22) 19.11.2018(43) 20.05.2020(57) Die Anmeldung be-trifft ein Beton­fertigbauteil (100, 200, 300) für Park-anordnungen (321), ins­besondere Parkhäuser (321), aufweisend...

more
Issue 11/2020

System and method for producing prestressed concrete composite beam ...

(10) WO 2020/075195 Al(22) 10.10.2019(43) 16.04.2020(57) A system and method for manufacturing composite prestressed concrete (PSC) beams using Basalt Fibre Reinforced Polymer (BFRP) bars as a...

more

Ihre Suche nach "" :

5791 Treffer in "AT Minerals"

8979 Treffer in "Bundesbaublatt"

8462 Treffer in "Betonwerk + Fertigteil-Technik"

7757 Treffer in "bauhandwerk"

1206 Treffer in "Brandschutz"

1262 Treffer in "Computer Spezial"

5477 Treffer in "dach+holzbau"

15345 Treffer in "Deutsche BauZeitschrift"

5763 Treffer in "FACILITY MANAGEMENT"

11315 Treffer in "Kälte Klima Aktuell"

5986 Treffer in "metallbau"

1597 Treffer in "recovery"

12058 Treffer in "SHK Profi"

13466 Treffer in "tab - Das Fachmedium der TGA-Branche"

12242 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2063 Treffer in "tunnel"

5809 Treffer in "Zement Kalk Gips"

3523 Treffer in "Ziegelindustrie International"