Lintec

Concrete distribution module used in the city of Hamburg

An office and commercial building is being constructed right in the city center of Hamburg at present. The location of the same at the bank of the river Alster requires a special construction method, in particular, as far as the underground parking lot and the foundations are concerned. Therefore, concrete was placed in the excavation pit from the top down. None of the truck-mounted concrete pumps available from the vehicle fleet of the Hamburg-based company Jetlift could reach the installation site directly.

In order to avoid concrete placement by means of hose lines, Jetlift made use of the...

Related articles:

Issue 2013-08 Lintec

Concrete distribution module in operation

Just four weeks following the start of Bauma 2013 in Munich, the leading trade fair for construction machinery, the innovative concrete distribution module of Lintec, from Buxtehude in Germany had to...

more
Issue 2014-12 Holcim Deutschland

Record attendance at the 9th Holcim ­Beton-Forum in Hamburg

More than 280 invited guests attended the 9th Holcim Concrete Forum in Hamburg. Seven speakers from the fields of urban development, architecture, science and journalism shared exciting insights on...

more
Issue 2013-07 Simem Spa/Putzmeister Group

Joined forces

Simem and Putzmeister agreed on a strategic integration. With joined forces the two companies want to conquer a significant global market share. Simem is a supplier of stationary and mobile concrete...

more