Elbe Decken

Four-story building for flexible use

In the north of Koblenz, on a site of around 660,000 m² in size, a complex has been created which links the fields of service, business and technology. The most recent addition is the office building of Volk Holding GmbH & Co. KG which covers a total gross floor space of 4,300 m² and offers a usable floor space of 3,750 m² for a workforce of 250. Modern working environments, from single offices via open-space offices to group offices promoting communication, are designed to ensure effective working. They are complemented by several conference rooms, a canteen, call center and fitness area.

The...

Related articles:

Issue 07/2016 Elbe Delcon

“Dortmund U” – huge school building project ­using ­prestressed concrete floor slabs

On the former plot of the Dortmund Union brewery the large-scale urban development project of the vocational college the so-called “Dortmunder U – Das Viertel” (“Dortmund U – The Quarter”) has...

more
Issue 01/2018 Elbe Decken

Opportunities for precast prestressed concrete floor slabs in building projects

In many European countries, like Belgium or the Netherlands, up to 70 % of all building projects are implemented by means of precast prestressed concrete floor slabs in the meantime. Despite their...

more
Issue 08/2009 An alternative to reinforced concrete

Use of prestressed concrete in floor slab production

Precast prestressed floors slabs from Echo-Elbe consist of a lower and upper concrete layer connected to each other via the webs. The prestressed strands and/or wires in sizes 5.7, 9.3 mm and 12.5...

more
Issue 02/2021 ELBE DECKEN

Prestressed concrete floor slabs for 99 homes in Berlin‘s Gropiusstadt

The Degewo housing corporation has realized a modern residential complex with 99 apartments on an overall gross floor area (GFA) of 12,750 m² using a serialized construction method – rental prices...

more