Friction-locked connection

Unicon® – modern precast assembly

 So far, the friction-locked connection of two precast concrete elements at the construction site was a weakness in the otherwise time and cost saving precast construction using factory-provided prefabrication. In traditional precast concrete construction, the elements were connected by means of casting wet concrete, sticking to the setting times was absolutely necessary and demounting was equivalent to demolition.

Now, things are quite different with the new mounting system Unicon of H-Bau Technik GmbH. The precast concrete elements are connected at the construction site by just plugging galvanized cast steel connectors together. An integrated adjustment system in x-, y- and z-direction allows to accommodate tolerances up to 20 mm also when mounted already. This even transfers high loads depending on the kind of anchorage in the concrete and the concrete quality of the precast concrete element. The geometry of the connector makes use of the dead load of the elements as contact force of the parts among...

Related articles:

Issue 03/2015 Peikko

Worldwide innovation in connection technology

The Finnish manufacturer Peikko brings to the market the world innovation Tenloc. The greatest advantage of Tenloc is the instant form-fitting and friction locking connection of individual precast...

more
Issue 05/2018 Halfen

Immediately load-bearing connection – new trend for  precast elements

The universally applicable Halfen HEK precast coupler is a practical solution for fast and efficient installation of precast concrete elements. Conventional connections for precast concrete elements...

more
Issue 01/2014

Precast elements for the Zölly Tower in Zurich

A prime residential development is currently under construction in the western part of Zurich, the Swiss economic hub, in the area of a former railway junction. In urban terms, the so-called...

more
Issue 11/2019 HIEBER

With made-to-measure precast elements directly to the lift shaft

The precaster Hieber Betonfertigteilwerk GmbH, in Wörleschwang, Germany, offers complete, ready-to-install floor-to-floor connections in the form of made-to-measure precast concrete elements for lift...

more
Issue 11/2017

Precast concrete element connector and system for connecting precast concrete elements

(11) EP 3 214 234 Al (22) 05.03.2016 (43) 06.09.2017 Patentblatt 2017/36 (57) Die Erfindung betrifft einen Fertigteilverbinder (3) zum Verbinden eines ersten Betonfertigteils (1) mit einem zweiten...

more