Search

Your search for "" found 8150 Hits

Issue 10/2015

Prefabricated floor element

(11) EP 2 907 933 A1 (22) 17.02.2015 (43) 19.08.2015 Bulletin 2015/34 (71) lsoBouw Systems B.V., 5711 EG Someren (NL) (84) Designated Contracting States: AL AT BE BG CH CY CZ DE DK EE ES Fl FR GB GR...

more
Issue 10/2015

Guide rail function with a modular concrete slab system

(10) WO 2015/121165 Al (22) 6. Februar 2015 (06.02.2015) (43) 20. August 2015 (20.08.2015) (71) PORR BAU GMBH [AT/AT]; Absberggasse 47, A-1100 Wien (AT). (84) ARIPO (BW, GH, GM, KE, LR, LS, MW, MZ,...

more
Issue 10/2015

Transfer rack for concrete element

(11) EP 2 774 812 A3 (22) 07.03.2014 (43) 10.09.2014 Bulletin 2014/37 (71) Sora ja Betoni, V. Suutarinen Ky, 52700 Mäntyharju (FI) (84) Designated Contracting States: AL AT BE BG CH CY CZ DE DK EE ES...

more
Issue 10/2015 Spiroll

New Termo Deck system for Botswana

In early 2014, Spiroll were contacted by John Durham, ­Managing Director of Termo Deck International Ltd., regarding a project in Gaborone, Botswana. Termo Deck is a system, pioneered using Spiroll...

more
Issue 10/2015 MC Bauchemie

New processing aid for concrete products

Concrete products manufactured under cool and humid environmental conditions are frequently subject to efflorescence during their first hours. MC-Bauchemie has now developed a new processing aid for...

more
Issue 10/2015 Sofistik

Executive board contract extended with Deinzer

Sofistik AG has early extended the contract with Frank Deinzer, their member of the board sales and marketing, for another three years until December 2018. With this step, the developer of civil...

more
Issue 10/2015 B. T. Innovation

Innovative mobile silage wagon panels

Successful application scenarios range from ordinary flood protection walls to the complex fairway of the “Chiapas” log flume roller coaster in the “Phantasialand” in Brühl near Cologne in...

more
Issue 10/2015

Effect of Calcium Nitrate on the freeze-thaw-resistance of concrete

Abstract Concrete in cold climates is not only exposed to cold weather while concreting but also to freeze-thaw cycles during its lifetime. Thus not only the concrete production needs to be adjusted...

more
Issue 10/2015 Betonimestarit/Peikko

3,000 m² of hollow core floor slabs per week from Nastola

Plant manager, Juha Pulkkanen, states the production figures rather matter-of-factly, although they definitely sound quite impressing: 3,000 m² of just hollow core floor slabs are manufactured on four...

more
Issue 10/2015 Grupo Perse/Weiler

High-performance prestressed-concrete ­production in Mexico

Grupo Perse’s product range is broadly based: from industrial structures, to shopping malls, and to residential buildings. The Mexican construction group satisfies all demands by the emerging...

more

Ihre Suche nach "" :

5499 Treffer in "AT Minerals"

8703 Treffer in "Bundesbaublatt"

8150 Treffer in "Betonwerk + Fertigteil-Technik"

7526 Treffer in "bauhandwerk"

1143 Treffer in "Brandschutz"

1149 Treffer in "Computer Spezial"

5190 Treffer in "dach+holzbau"

14779 Treffer in "Deutsche BauZeitschrift"

5557 Treffer in "FACILITY MANAGEMENT"

10811 Treffer in "Kälte Klima Aktuell"

5689 Treffer in "metallbau"

1433 Treffer in "recovery"

11749 Treffer in "SHK Profi"

13062 Treffer in "tab - Das Fachmedium der TGA-Branche"

12040 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2003 Treffer in "tunnel"

5684 Treffer in "Zement Kalk Gips"

3431 Treffer in "Ziegelindustrie International"