(10) DE 10 2016 101 360 Al(22) 26.01.2016(43) 27.07.201757) Die Erfindung betrifft ein Fertigteil (1), mit schalenartiger Erstreckung, zur Errichtung eines Bauwerks (50), umfassend eine erste...
The non-swimmer’s pool in the outdoor area of the Nettebad in Osnabrück presented itself in dire need of refurbishment. Broken tiles, leaking drains: the basin, which had been completed in 1973, was...
In Neubrunn, in south Thuringia, Germany, the company Wasa began some time ago, in 2006, with the manufacture of wetcast molds made of polyurethane for high-quality concrete products. Today wetcast...
(10) DE 20 2016 101 363 U1(22) 11.03.2016(45) 20.07.2017(57) Formsteinverbundsystem mit (a) einem ersten Ersttyp-Pflasterstein (12.1), der einen Ersttyp-Grundkörper (24), hat, wobei der...
Schöck AG, the industry specialist based in Baden-Baden, Germany, and Fiberline Composites A/S, Middelfart, Denmark, start a joint venture. Purpose of the undertaking is the further development and...
(10) US 2017/0198478 Al(22) 15.06.2015(43) 13.07.2017(57) To provide a prestressed concrete which can be used for non-primary structural members such as general building members by using a chemical...
(10) DE 10 2016 124 853 Al(22) 19.12.2016(43) 13.07.2017(57) Schalungselement für Betonschalungen, mit zwei Schalungs-tafeln (12), die durch Verbindungselemente (18; 18‘) parallel und in Abstand...
(11) EP 3 192 632 A1(22) 04.01.2017(43) 19.07.2017 Bulletin 2017/29(57) A process for manufacturing prefabricated infill panels of the „thermal break“ type for the building industry in a formwork...
(10) US 2017/0204606 Al (22) 29.04.2015(43) 20.07.2017(71) Technische Hochschule Mittelhessen, Gießen (DE)(57) The invention relates to L-shaped sheet metal parts 21 with an angled longitudinal recess...
(11) PH12017500255 (A1)(57) The invention relates to a concrete construction of modular design, comprising at least two upright precast concrete wall elements (7, 7‘,..., 7m) which are arranged next...