Search

Your search for "" found 8247 Hits

Issue 10/2018

Concrete paving block

(10) DE 20 2018 002 424 U1 (22) 17.05.2018(45) 02.08.2018(73) Roth, Reiner, Dipl.-Ing. (FH), 66564 Ottweiler(57) Betonpflasterstein als Quaderstein mit gleich geformten, unterhalb der Steinhöhe...

more
Issue 10/2018

Thrust restraint block and method for the  manufacture of a thrust restraint block

(10) DE 10 2017 102 821 Al (22) 13.02.2017(43) 16.08.2018(57) Die Erfindung betrifft einen Schub­sicherungsstein (1), welcher einen Pflasterstein (2) und ein Ankermittel (3) umfasst. Hierbei umfasst...

more
Issue 10/2018 RATEC

Magnetic formwork component for circulation plant in Chile

According to the forecasts, the Chilean construction sector has left the bad times behind. Experts estimate growth of one to three percent in 2018. On account of its volume and the high number of...

more
Issue 10/2018

Teka supplies mixing equipment to long-established Bavarian building materials producer

Renowned brick and precast producer Wöhrl Ziegel & Fertigteile recently commissioned Teka Maschinenbau GmbH with overseeing and implementing the complex factory overhaul at its premises in...

more
Issue 10/2018 CCL/SPIROLL

Spiroll supplies seismically modified equipment in Irkutsk

Spiroll, the precast concrete specialist within the CCL group, has provided both design consultancy and supply of hollowcore production equipment to New Gorod; a developer, construction contractor and...

more
Issue 10/2018

New metropolitan transport system from Toluca to Valle de Mexico

The Toluca-Valle de México Interurban Passenger Train is a project of the Federal Government that is part of the National Development Plan for the years 2013 to 2018. The precast elements for this...

more
Issue 10/2018 B.T. INNOVATION

Manufacturing double walls without shell offset

The manufacture of double walls in pallet circulation systems is a well-established and highly efficient production process. However, production-related faults often occur in this process. This...

more
Issue 10/2018 FILIGRAN TRÄGERSYSTEME

Filigran punching shear reinforcement newly assessed

The FDB Filigran punching shear reinforcement consists of spatial welded reinforcement elements with optimized geometry. The punching shear resistance of flat slabs is more than doubled by using FDB,...

more
Issue 09/2018 OTTO QUAST/STRASSEN NRW

First fully prefabricated motorway bridge built in NRW, Germany

Following what could be termed a record-breaking short construction time of only 100 days, the new Hammacher Strasse bridge in Hagen in the German federal state of North Rhine-Westphalia, spanning...

more
Issue 09/2018

Digital mold management system creates transparency in the concrete block plant

OGS develops, in collaboration with industry partners, a software for the management of concrete block molds. At any time, the users know the position of a mold, whether it has to be maintained and...

more

Ihre Suche nach "" :

5585 Treffer in "AT Minerals"

8799 Treffer in "Bundesbaublatt"

8247 Treffer in "Betonwerk + Fertigteil-Technik"

7584 Treffer in "bauhandwerk"

1152 Treffer in "Brandschutz"

1176 Treffer in "Computer Spezial"

5295 Treffer in "dach+holzbau"

14951 Treffer in "Deutsche BauZeitschrift"

5659 Treffer in "FACILITY MANAGEMENT"

10949 Treffer in "Kälte Klima Aktuell"

5793 Treffer in "metallbau"

1487 Treffer in "recovery"

11849 Treffer in "SHK Profi"

13212 Treffer in "tab - Das Fachmedium der TGA-Branche"

12107 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2027 Treffer in "tunnel"

5761 Treffer in "Zement Kalk Gips"

3457 Treffer in "Ziegelindustrie International"