(10) WO 2020/027405 A1(22) 02.05.2019(43) 06.02.20(57) The present invention relates to a concrete pile structure using a modular pile, and a modular pile manufacturing apparatus and method, which...
(10) WO 2020/023999 Al(22) 26.07.2019 (43) 06.02.2020(57) There is proposed a reinforced concrete structure comprising a reinforcement assembly embedded therein, the reinforcement assembly including...
(10) WO 2020/005183 A3(22) 12.04.2019(43) 02.01.2020(57) The present invention is a reinforcing member manufactured from synthetic fibers suitable for reinforcing concrete comprises synthetic nylon...
(10) US D875,274 S(22) 30.05.2018(45) 11.02.2020(57) We claim the ornamental design for a front face of a concrete wall block, as shown and described.DESCRIPTION FIG. 1 is a front view of a front face...
(10) US 2020/0048857 Al(22) 12.08.2019(43) 13.02.2020(57) A prefabricated former for an underground pump station comprises: a floor former; a plurality of vertical support elements; a side wall...
(10) HRP20192158 (T1)(43) 21.02.2020(57) Die Erfindung betrifft ein Modul (1) zur Herstellung von Betonteilen, hergestellt im Ortbetonverfahren (insitu) oder im Fertigteilwerk, das eine Reihe (2) aus...
(10) EP3601675 (A1)(43) 05.02.2020(57) The slot drain 1 is configured to expand and contract in response to contraction and expansion of one or more adjacent concrete slabs. The slot drain may...
(10) DE 20 2019 107 085 U1(22) 18.12.2019(45) 20.02.2020(57) Betonbohr- oder Betonsägeanordnung (1), aufweisend ein Betonbohrgerät (2) oder ein Betonsägegerät, welches mittels elektrischem Strom...
(10) DE 10 2018 119 890 A1 (22) 16.08.2018(43) 20.02.2020(57) Die Erfindung betrifft eine Ankerschiene (1) zu einer Befestigung von Hammerkopfschrauben in Beton. Die Erfindung schlägt vor, Anker (3)...
The international workshop on “Digital Fabrication with Concrete” took place on 30 January 2020 in Berlin. It was jointly organized by the DBV (German Society for Concrete and Construction Technology)...