Formwork for the perfect facade

On the basis of the design proposed by award-winning architects Barkow Leibinger, the „Tour Total“ office building is being constructed behind Berlin Main Station. This high-rise structure is dominated by its facade. The production of the corresponding precast elements required particularly demanding formwork specifications.

On the basis of the design proposed by award-winning architects Barkow Leibinger, the “Tour Total” office building, a development managed by CA Immo, is being constructed behind Berlin Main Station. The new German headquarters of French oil corporation Total will be the first building block of the so-called “Europacity” development area. This slender, slightly bent high-rise building is dominated by its facade, which consists of a three-dimensional curtain walling composed of filigree precast concrete panels.  The façade’s formal language and some of its design details are reminiscent of the...

Related articles:

Issue 02/2013 A perfect architectural concrete example

Tour Total Berlin

Production report by Dreßler Bau GmbH The facade of the 17-story German headquarters of French oil corporation Total is not just an “off-the-shelf” architectural concrete facade. More than 80...

more
Issue 12/2015 Alkus

More than 1.000 precast elements produced with 13 formwork units

An impressive office and commercial building of Swiss Life AG is under construction in Zurich. The three-piece building complex with different dimensions and number of stories was given the name Tic,...

more
Issue 08/2024 BT innovation

Decorative precast element surfaces thanks to LiquidForm

In the production of precast concrete and sandwich panels, modern precast plants place great emphasis on high surface quality and maximum efficiency. Top-quality precast element surfaces include...

more
Issue 02/2018 Silhouette International in Linz/Ah

Precast façade in white concrete

The objectives of the architect were to establish, first, a reference between the outer appearance of the plant building and the products – spectacles – to be manufactured inside upon completion, as...

more
Issue 01/2014

Precast elements for the Zölly Tower in Zurich

A prime residential development is currently under construction in the western part of Zurich, the Swiss economic hub, in the area of a former railway junction. In urban terms, the so-called...

more