Search

Your search for "" found 8189 Hits

Issue 10/2018

System for protection from floods

(10) DE 10 2017 102 373 Al (22) 07.02.2017(43) 09.08.2018(57) Die Erfindung geht aus einem Sys­tem zum Schutz gegen Hochwasser (80), umfassend zumin­dest ein im Erdreich verankertes und vollständig...

more
Issue 10/2018

Device for fixing rails on concrete sleepers

(10) DE 10 2017 001 401 Al (22) 14.02.2017(43) 16.08.2018(57) Die Erfindung betrifft eine Einrich­tung für die Befestigung von Schienen auf Betonschwellen, wobei die auf Betonschwellen verlegte...

more
Issue 10/2018

Concrete paving block

(10) DE 20 2018 002 424 U1 (22) 17.05.2018(45) 02.08.2018(73) Roth, Reiner, Dipl.-Ing. (FH), 66564 Ottweiler(57) Betonpflasterstein als Quaderstein mit gleich geformten, unterhalb der Steinhöhe...

more
Issue 10/2018

Thrust restraint block and method for the  manufacture of a thrust restraint block

(10) DE 10 2017 102 821 Al (22) 13.02.2017(43) 16.08.2018(57) Die Erfindung betrifft einen Schub­sicherungsstein (1), welcher einen Pflasterstein (2) und ein Ankermittel (3) umfasst. Hierbei umfasst...

more
Issue 10/2018 RATEC

Magnetic formwork component for circulation plant in Chile

According to the forecasts, the Chilean construction sector has left the bad times behind. Experts estimate growth of one to three percent in 2018. On account of its volume and the high number of...

more
Issue 10/2018

Teka supplies mixing equipment to long-established Bavarian building materials producer

Renowned brick and precast producer Wöhrl Ziegel & Fertigteile recently commissioned Teka Maschinenbau GmbH with overseeing and implementing the complex factory overhaul at its premises in...

more
Issue 10/2018 CCL/SPIROLL

Spiroll supplies seismically modified equipment in Irkutsk

Spiroll, the precast concrete specialist within the CCL group, has provided both design consultancy and supply of hollowcore production equipment to New Gorod; a developer, construction contractor and...

more
Issue 10/2018

New metropolitan transport system from Toluca to Valle de Mexico

The Toluca-Valle de México Interurban Passenger Train is a project of the Federal Government that is part of the National Development Plan for the years 2013 to 2018. The precast elements for this...

more
Issue 10/2018 B.T. INNOVATION

Manufacturing double walls without shell offset

The manufacture of double walls in pallet circulation systems is a well-established and highly efficient production process. However, production-related faults often occur in this process. This...

more
Issue 10/2018 FILIGRAN TRÄGERSYSTEME

Filigran punching shear reinforcement newly assessed

The FDB Filigran punching shear reinforcement consists of spatial welded reinforcement elements with optimized geometry. The punching shear resistance of flat slabs is more than doubled by using FDB,...

more

Ihre Suche nach "" :

5515 Treffer in "AT Minerals"

8735 Treffer in "Bundesbaublatt"

8189 Treffer in "Betonwerk + Fertigteil-Technik"

7531 Treffer in "bauhandwerk"

1146 Treffer in "Brandschutz"

1154 Treffer in "Computer Spezial"

5240 Treffer in "dach+holzbau"

14860 Treffer in "Deutsche BauZeitschrift"

5599 Treffer in "FACILITY MANAGEMENT"

10829 Treffer in "Kälte Klima Aktuell"

5736 Treffer in "metallbau"

1452 Treffer in "recovery"

11764 Treffer in "SHK Profi"

13124 Treffer in "tab - Das Fachmedium der TGA-Branche"

12050 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2003 Treffer in "tunnel"

5725 Treffer in "Zement Kalk Gips"

3433 Treffer in "Ziegelindustrie International"