DBV

Workshop “Cracks in Reinforced concrete – ordered, planned, constructed?”

Because of the high demand in autumn 2016, Deutsche Beton- und Bautechnik-Verein e.V. (DBV) organizes the half-day workshop “cracks in reinforced concrete – ordered, planned, constructed?” on additional dates in 2017. The workshop is aimed at foremen, side managers, project managers as well as structural engineers, building object planners and constructors/owners.

Reinforced concrete – the cracked building material. Actually, this statement is a matter of course, but, anyhow, the formation of cracks is again and again an issue of dispute during and after the execution of a building project....

Related articles:

Issue 11/2017 DBV

Workshop „Cracks in reinforced concrete – ordered, planned, constructed?“

Because of the high demand in 2016 and 2017, Deutsche Beton- und Bautechnik-Verein e. V. (DBV) organizes the half-day workshop „cracks in reinforced concrete – ordered, planned, constructed?“ on...

more
Issue 02/2017 Background and explanations to the new DBV Code of Practice

Limitation of crack formation in reinforced and ­prestressed concrete

On the occasion of the introduction of Eurocode 2 DIN EN 1992 “design of concrete structures” including the associated national annexes for building construction and bridge construction in 2012 and...

more
Issue 05/2018 DAFSTB/DBV

Workshop on „Waterproof concrete structures“

The WP Code of Practice of DAfStb has been published now. This is reason for the German Committee for Reinforced Concrete (DAfStb – Deutscher Ausschuss für Stahlbeton e.V.) and the German Society...

more
Issue 06/2026

Concrete Damage in Precast Reinforced Concrete Elements

Causes and Manifestations Concrete damage can result from several factors, including design, construction, and material defects, as well as chemical and physical influences. Common types of damage to...

more
Issue 02/2020 DafStb Code of Practice

Members constructed of hollow-core slabs

Work on the DafStb Code of Practice on precast hollow-core slabs [1] began in November of 2017. The Code of Practice is planned to consist of two parts: Part 1: Reinforced-concrete hollow-core slabs...

more