Related articles:

Issue 2014-04

Precast concrete post tensioned segmented wind turbine tower

(10) WO 2014/021927 A2 (22) 02.08.2013 (43) 06.02.2014 (71) LOCKWOOD, James, D. [US/US]; 5500 Flatiron Pkwy, Suite 100, Boulder, CO 80301 (US) (84) ARIPO (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD,...

more
Issue 2017-01

Method of constructing a tower of concrete segments

(11) EP 3 095 569 A1 (22) 04.02.2015 (43) 23.11.2016 Bulletin 2016/47 (57) Method of constructing a tower with concrete tower segments. After casting and hardening of a first tower segment, a second...

more
Issue 2018-06

Structural concrete tower and assembly method

(10) W02018068117 A1 (22) 10.10.2017 (43) 19.04.2018 (57) A structural concrete tower and assembly method, said tower comprising the superpositioning of a first (21) and a second (22) tower segment,...

more
Issue 2019-11

A method of manufacturing precast concrete segments for a tower

(10) AU2017410098 (A1) (22) 26.09.2019 (43) 18.04.2017 (57) Concrete segments destined to form all or part of a tower (2), the segments being destined to be superimposed within the tower. The method...

more