Search

Your search for "" found 8244 Hits

Issue 02/2013 Monitoring of concrete placement

Testing ages deviating from the 28-day principle

In most concrete engineering applications, a concrete testing age of 28 days is useful to determine its strength, which also applies to on-site monitoring. On the one hand, the concrete has usually...

more
Issue 02/2013

Road element

Issue 02/2013

Influence of various de-icing agents on the durability of concrete products

According to information published by the Bundesverband Straße, Landschaft, Garten e.V. (SLG; Federal Association for Road Construction, Landscaping and Gardening), the 2009-10 and 2010-11 winter...

more
Issue 02/2013

Issue 02/2013 PVA fiber-reinforced, ready-mixed dry lightweight concrete

A refurbishment material with great potential

Timber beam floors often need to be strengthened as a result of changes in building use or because of increasingly demanding requirements. A tried and tested approach to achieving this is to create a...

more
Issue 02/2013 Production of high-performance concretes to specification

Rheology-based mixing process management

Rationale High-performance concretes (HPCs) are becoming increasingly attractive in construction practice due to their very dense matrix that results in outstanding durability and strength parameters....

more
Issue 02/2013 Modeling and measuring for the Hohenheimer Strasse model project in Stuttgart, Germany

Photocatalysis in concrete terms

Manufacturers of concrete products have been working with photocatalytically active surfaces for a number of years. In collaboration with HeidelbergCement AG, a software tool for quantitative...

more
Issue 02/2013 Day 2: Wednesday, 6th February 2013

From research to practice

Title Titel Freeze/thaw resistance at moderate water saturation levels – current findings with respect to the XF2 freeze/thaw test method Frostwiderstand bei mäßiger Wassersättigung –...

more
Issue 02/2013 Current labor law

Self-employed collaboration on the basis of contracts for work – The easy way to achieve flexibility?

The award of works or services on the basis of contracts for work can be an option to achieve a greater degree of flexibility within the business. Issues such as the continued payment of wages and...

more

Ihre Suche nach "" :

5580 Treffer in "AT Minerals"

8795 Treffer in "Bundesbaublatt"

8244 Treffer in "Betonwerk + Fertigteil-Technik"

7583 Treffer in "bauhandwerk"

1151 Treffer in "Brandschutz"

1174 Treffer in "Computer Spezial"

5293 Treffer in "dach+holzbau"

14949 Treffer in "Deutsche BauZeitschrift"

5621 Treffer in "FACILITY MANAGEMENT"

10944 Treffer in "Kälte Klima Aktuell"

5791 Treffer in "metallbau"

1466 Treffer in "recovery"

11847 Treffer in "SHK Profi"

13205 Treffer in "tab - Das Fachmedium der TGA-Branche"

12106 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2005 Treffer in "tunnel"

5761 Treffer in "Zement Kalk Gips"

3455 Treffer in "Ziegelindustrie International"