Precast elements in the historic context – A prefabricated façade for the Jacoby Studios in Paderborn

The site of the former St. Vincenz State Hospital is located in the medieval city center of Paderborn, directly adjacent to the springs of the river Pader. Over a period of three years, the hospital complex whose nucleus dates back to a 17th century monastery was converted into the Jacoby Studios, the headquarters of the Paderborn-based TAP Holding, based on the design by David Chipperfield Architects, Berlin, and under the head responsibility of Schilling Architekten, Cologne.

The historic complex was partially destroyed during the Second World War and subsequently reconstructed and extended in the post-war period, including a comprehensive redesign to meet the
requirements arising from its use as a hospital. In the current project,
post-war additions to the buildings were removed to expose the remaining historic fabric, creating a picturesque “ruin” structure with the former cloister at its heart. In addition, the project includes generously designed new wings arranged north, west, and south of the existing building in response to the orthogonal order.

The appearance of the new buildings essentially builds upon their precast element design comprising vertical partition walls and
horizontal balconies. Some of the bays are fully covered with suspended
concrete façade panels. These sharp-edged elements conform to the highest architectural concrete standards while blending harmoniously with the historic brickwork and quarry stone masonry to form
a new urbanistic whole.

Combining the old with the new – concrete with quarry stone – gave rise to a coherent yet exciting composition interlinking the new with the historic context.

As one of seven projects in Germany, the Jacoby Studios have been nominated for the 2021 European Union Prize for Contemporary
Architecture – Mies van der Rohe Award. In November 2020, the project received the 2020 “Respekt und Perspektive. Bauen im Bestand” [Respect and Perspective. Reconstruction of Existing Buildings] prize awarded by Deutsche Bauzeitung.

Co-author / weiterer Autor:

Dipl.-Ing. Arch. Jochem Vieren, Schilling Architekten, Köln

x

Related articles:

Issue 01/2012

Problems at pan-type mixers solved

Every person involved in concrete manufacturing knows the countless problems with hardened concrete caused by worn out mixing arm bearings and spring units. Pan mixers of any common manufacturer...

more
Issue 02/2017 Architectural concrete for Berlin public buildings

Berlin Palace reconstruction and James Simon Gallery

Either of these projects is in the focus of the general public, and opinions strongly diverge even within the architectural community. Quite a number of proponents of the reconstruction of the Berlin...

more
Issue 03/2017 Schöck Bauteile

Living space with free space: solution for balcony design

Living space in Berlin has long become a scarce commodity – especially affordable one. With the ready-to-occupy Paragon Apartments on Danziger Strasse, Pankow has accepted this challenge and...

more
Issue 01/2010 Patent

Mixing arm of Pucest®

Every concrete worker is familiar with the pictures of a worn out mixing arm bearing and spring units with hardened concrete residues. As is well-known, all these may result in numerous problems. Pan...

more
Issue 11/2023

Historic Stellenbosch Bridge rebuilt with precast concrete beams

The old bridge over the Plankenbrug River (formerly Dwars River) in Stellenbosch has been rebuilt by Martin & East (Pty) Ltd with nine precast concrete beams supplied by Concrete Manufacturers...

more