Building system using modular precast concrete components

(10) US 2016/0298327 A1

(22) 16.06.2016

(43) 13.10.2016

(57) A building system with modular precast concrete compo­nents uses bulb tee beams to span between walls that are distributed within the building footprint to open up the structure. Shallow corrugated slabs span between the bulb tee beams to form the floor deck. Optionally, double tee beams can be used at the periphery of the structure for longer spans.

(71) Rocky Mountain Prestress, LLC, Denver, CO (US)

Related articles:

Issue 06/2019

Simplified precast concrete system with rapid assembly formwork

(10) US 10,260,224 B1 (22) 05.09.2018 (57) The disclosed system divides the precast and cast-in-place construction into vertical and horizontal components. The vertical components are precast,...

more
Issue 02/2014 Concept

Optimizing floor systems in precast concrete construction –

Within budgets for building construction about 60 per cent of the costs incurred in the structural design are provided for the shell construction, with the main part accounting for the floor...

more
Issue 02/2014 The Fliegl Agrartechnik project in Mühldorf

Encompassing all facets of precast construction –

The newly built factory constructed under the direction of Laumer Bautechnik GmbH impressively demonstrates the development of a business active in the field of agricultural engineering to a globally...

more
Issue 07/2014 Haitsma Beton

Super long concrete beams installed with success

Quite recently, the Dutch company Haitsma Beton B.V has successfully installed several 68 m long box beams with a weight of 240 tons. They are used for spanning the main span of the new bridge near...

more
Issue 04/2015

Prefabricated modular rebar modules and methods of using the same

(12) CA 2867964 A1 (22) 2014/10/16 (45) 2015/02/06 (71) BUZIMKIC, EMIN, CA; BAUGAARD, KEITH, CA (57) There is provided a reinforcing steel structure for use in a concrete building wall. The structure...

more