LIAPOR

Building faster with Liapor elements

Building in high quality, sustainable and particularly fast – this demand can be perfectly realized by the prefabricated elements made of Liapor lightweight concrete. Most recent example: a new apartment building in the German city of Renningen. Kastell GmbH located in Veringenstadt was responsible for the shell construction, and construction site management was taken over by SchwörerHaus KG Komplettbau based in Simgaringen.

„Enabling us to erect, in particular, the building shell in the shortest possible time, we used precast construction with prefabricated elements here,“ emphasizes Ewald Bantle of SchwörerHaus KG. For this purpose, among others, 180 wall elements made of Liapor lightweight concrete in strength class LAC 2 were produced by Kastell GmbH.

A natural with many advantages

„The accurately fitting wall elements made of Liapor lightweight aggregate concrete with open structure are provided with all block-outs for later installation of building services and ensure a particularly fast construction progress,“ confirms Bernhard Schmitt, site manager at Kastell GmbH.

The Liapor elements are insensitive to frost and moisture, and complying with fire resistance class F180 they even meet the highest fire protection requirements. Last but not least, the Liapor expanded clay spheres also ensure very good sound insulation values and a pleasant, always balanced indoor climate. The Liapor expanded clay spheres with their fine, air-filled porous inner structure and the sintered, ceramic outer shell are responsible for these excellent properties.

After the completion of the elaborate foundation works reaching up to 8 m deep, the shell was built for the apartment building in Renningen – in fact at a possibly record-breaking pace: „Thanks to the dimensionally accurate wall elements, one residential floor could be realized within a week,“ reports site manager Ewald Bantle. „Accordingly, the other installation works could be carried out rapidly, too. The custom-made windows could also be easily installed in the exactly fitting wall openings.“ Hence, the building shell was completed after just over four weeks.

Related articles:

02/2013 Liapor GmbH

Ideal conditions for care and recovery

Silence, a sense of well-being and a feeling of security are even of particular importance in nursing facilities and rehabilitation centers. These requirements also applied to the construction of the...

more
03/2011 A building sculpture made of lightweight concrete

Berlin: Residential and commercial building

One of the highlights of the new building is the black façade appearing in a fair-faced concrete free of joints. However, owing to the ambitious architecture with cantilevers of more than twelve...

more
04/2013 F.C. Nüdling GmbH

Liapor NeoStone provides excellent thermal insulation

When building a house, there are several ways to comply with the statutory provisions concerning energy saving standards: Often single-skin masonry constructions are used in combination with a...

more
07/2012

EU commission awards INSU-SHELL

The EU commission has awar­ded INSU-SHELL with the Best of the Best Life Environ­ments Award. The project partners RWTH Aachen University, DuraPact, Saint Gobain Technical Fabrics and Gimpel...

more
12/2016 Liapor

Town house newly interpreted by lightweight concrete

A clear, simple cube, appearing rich in contrast and coherent all the same – this is how the new office and residential building of Flosundk architektur+urbanistik GmbH presents itself in...

more