(11) EP 3 249 138 A1
(22) 15.01.2016
(43) 29.11.2017 Bulletin 2017/48
(57) The concrete tower comprises: a shaft (1) and a foundation (2). The shaft (1) is formed by two distinct segments: - an upper...
(10) W02018068117 A1
(22) 10.10.2017
(43) 19.04.2018
(57) A structural concrete tower and assembly method, said tower comprising the superpositioning of a first (21) and a second (22) tower segment,...
(10) DE 10 2016 114 661 A1
(22) 08.08.2016
(43) 08.02.2018
(57) Die Erfindung betrifft ein Turmsegment eines Turms ei-
ner Windenergieanlage, einen Turmabschnitt einer Windenergieanlage,...
A Liebherr Betomat V 1010 mixing tower has recently been commissioned at Alfons Greten GmbH & Co. KG in Essen/Oldenburg, Germany. Featuring a diameter of 10.5 m and an overall height of 32 m, the...