Many employers use the winter period to train their staff. To this end, some manufacturing plants enabled their employees to take part in the nationwide unique further training courses for precast...
As an international meeting place for the industry, bauma is not only a showcase for the latest technologies, but also a platform for professional conversations and the discussion of key future...
Co-reactive GmbH is a new member of Solid Unit, the network for climate-neutral construction with mineral building materials. The spin-off from RWTH Aachen University is developing and scaling up an...
After a six-week overhaul, the rotary kiln at the Kirchdorf cement plant is back in operation. A total of 29,000 working hours were invested. Important work included the replacement of 230 tonnes of...
(10) WO2024247577A1(22) 25.04.2024(43) 05.12.2024(57) The problem of the present invention is to provide a method for correcting the inclination of a concrete slab, when one side of the concrete slab...
(10) WO2024243677A1(22) 23.05.2024(43) 05.12.2024(57) A connectable panel for a stay-in-place modular concrete formwork system neatly stacks with other identical connectable panels. In a stack of such...
(10) US2020254647A1(22) 20.01.2020(43) 13.08.2020(57) A method for manufacturing a prefabricated concrete product is disclosed, in which method, a concrete slab with a recess at its upper surface is...
(10) WO2024258286A1(22) 17.06.2024(43) 19.12.2024(57) The invention relates to a method for fabricating a concrete slab (100) with an elongated channel (103) by using a digging tool (120) which...