Precast concrete floor slab and construction method thereof

(10) JP2022030042A

(22) 06.08.2020

(43) 18.02.2022

(57) To provide a precast concrete floor slab and its construction method having improved workability at a construction site.solution: A precast concrete floor slab 10 is provided with a body 1 and engaging parts 2 provided on opposite circumferential surfaces of the body 1. The engaging parts 2 are upper engaging parts 21 each including: an upper surface 11 flush with the upper surface 11 of the body 1; a lower surface 12 flush with the lower surface 12 of the body 1 and having a shorter protruding length from the body 1 than that of the upper surface 11; a first vertical surface extending vertically downward from an end of the upper surface 11; a second vertical surface extending vertically upward from an end of the lower surface 12; and an inclined surface connecting between a lower end of the first vertical surface and an upper end of the second vertical surface. When one of the engaging parts 2 is the upper engaging part 21 on the opposed circumferential surfaces of the body 1, the other engaging part is composed of a lower engaging port 22.Selected Drawing: Figure 1

(71) Tokyu Kensetsu KK (JP)

x

Related articles:

Issue 10/2023

Precast concrete slab and construction method for the same

(10) JP2023027341A (22) 21.12.2022 (43) 01.03.2023 (57) To provide a precast concrete floor slab and construction method for the same having improved on-site workability. Solution: A precast concrete...

more
Issue 06/2025

Fabricated high-strength prefabricated floor slab and manufacturing process

(10) CN119122171 (22) 14.09.2024 (43) 13.12.2024 (57) The invention relates to the technical field of concrete members, in particular to an assembly type high-strength prefabricated floor slab and a...

more
Issue 03/2018

An edge protector adapted to be cast into the edge of a concrete floor slab

(10) US 2018/0010349 Al (22) 22.01.2016 (43) 11.01.2018 (57) Edge protectors are useful to be cast into the edges of concrete slabs to prevent spalling thereof after shrinkage has occurred and a gap...

more
Issue 06/2025

Full-prefabricated floor slab connecting joint

(10) CN115977290 (22) 13.01.2023 (43) 18.04.2023 (57) The fully-prefabricated floor slab connecting joint comprises a fully-prefabricated floor slab and a steel beam, the fully-prefabricated floor...

more
Issue 03/2024

Adjustable rod holder for concrete construction

(10) WO2023220334A1 (22) 12.05.2023 (43) 16.11.2023 (57) A rod holder for being embedded in concrete includes a body including a first opening for holding an end portion of a threaded rod, the first...

more