With the BSA 1409 HP D5, Putzmeister has developed a new high-pressure stationary concrete pump for demanding pumping tasks. During its first practical application as part of the Frankfurt subway expansion project, the machine pumped fresh concrete through a pipeline approximately 500 m long. The focus was on pumping performance, the coordination of concrete logistics, and the reliable handling of fresh concrete.

For pumping concrete over long distances, high-performance pump technology and a coordinated material supply are crucial. With the BSA 1409 HP D5, Putzmeister is expanding its 1400 series with a high-pressure stationary concrete pump specifically designed for building construction applications and long pumping distances. The series was first unveiled at bauma 2025. Following extensive testing, the new model has been available since 2026.

According to the manufacturer, the BSA 1409 HP D5 bridges the gap between the compact BSA 1409 with a 1.4 m piston stroke and the larger BSA 2109 with a 2.1 m piston stroke. It is powered by a 180 kW Deutz TCD 6.1 L6 diesel engine. The engine meets EU Stage V emissions standards. According to Putzmeister, the machine operates with reduced noise and exhaust emissions, which is particularly advantageous in confined spaces.

Concrete Pumping over Approximately 500 m

The new pump technology’s first deployment – during the expansion of Frankfurt’s U5 subway line into the Europaviertel – demonstrates how it performs in practice. There, Jochum Betonpumpen GmbH from Egelsbach is responsible for concrete pumping, while EKS Beton from Frankfurt-Kalbach is supplying the required ready-mix concrete.

An extensive pipeline system was installed for the concrete placement work. From the stationary pump set up above ground, a DN 125 pipe first runs about 20 m down through a shaft and then another 30 m to the tunnel entrance. This is connected to a permanently installed ZX pipeline approximately 450 m long. At the end of the pipeline, the diameter is reduced to DN 100, with a manual gate valve installed at this point. An additional hose line, approximately 70 m long, allows for flexible concrete distribution at the placement site.

Before concrete placement began, the pipeline system was primed with a cement-water slurry without aggregate. Subsequently, the pumping of fresh concrete began. A major challenge was coordinating the timing between concrete production, transport, and placement. No more than 90 minutes were allowed to elapse between mixing the concrete at the plant and pouring it into the pump hopper.

During the first concrete pour, the BSA 1409 HP D5 maintained a constant pumping pressure of 30 to 40 bar. Approximately 48 m³ of concrete was placed in just under five working hours. On the following days, daily pumping volumes ranged between 32 and 56 m³.

Cleaning the Delivery Lines

Cleaning the long delivery line also required a coordinated approach. After the concrete placement was completed, the pipeline was first flushed with water up to the reducer. The flushing water was then forced back out using compressed air. Jochum had specially manufactured a steel trough to collect residual concrete and cleaning water. The remaining hose line was cleaned directly in the tunnel using IBC containers provided on site.

This first practical application demonstrates the interplay of pump technology, pipeline routing, and concrete logistics when conveying fresh concrete over long distances.