Dennert introduces guaranteed delivery times for Precast Concrete Stairs
Starting January 1, 2027, Dennert will offer a restructured product range for precast concrete stairs featuring various configurations and an optional guaranteed delivery time of six to eight weeks. According to Dennert, a recent Heinze industry survey commissioned by the company and conducted among architects and structural engineers shows that reliable delivery times are of great importance to many of the respondents.
“The market isn’t demanding even better concrete staircases, but rather simpler, faster and more reliable processes. For the majority of decision-makers, reliable delivery times are far more important than the costs alone,” says Dennert’s Head of Marketing Andreas Zinsmeister, summarizing the results. The company is responding with a three-pillar concept ranging from basic staircases in various configurations to custom designs for complex geometries. A guaranteed delivery time of six to eight weeks can be added as an option.
Industrially Manufactured Precast Concrete Stairs
The ready-to-install precast concrete stairs for indoor and outdoor use are manufactured to exact dimensions in straight-flight or turning configurations, including matching landings. According to the company, the components feature a factory-finished surface quality in exposed concrete class 2, integrated, tested sound insulation, smooth, form-finished soffits and integrated sleeves for safety railings.
Custom Shapes and Geometries
According to the survey, nearly one in two architects surveyed regularly requires custom shapes. Delivery times of up to 16 weeks may occur. In addition to standard designs, Dennert also manufactures custom geometries, individual angles, variable flight widths and project-specific connection details.
Guaranteed Delivery Time as an Option
Regardless of the selected design variant, an express option can be added. For an additional charge, Dennert guarantees delivery within six to eight weeks. If the deadline is exceeded, the contractual guarantee covers the crane costs.
Clients can use an online delivery calendar to book or view delivery times and dates themselves. This is intended to reduce the need for coordination via email or phone.
Production in Schlüsselfeld
According to Dennert, the company produces more than 1,000 stair systems annually. Industrial prefabrication replaces on-site formwork, reinforcement installation and concreting. According to the company, its in-house installation teams require around 30 min to install one precast concrete stair unit.
The stair systems are also part of the Dennert solid construction system, which is used from shell construction through to turnkey modular construction.
