Search

Your search for "" found 8695 Hits

Issue 02/2023 IAB WEIMAR

IAB-Tage “Beton” 2022: Multi-faceted conference program, casual atmosphere

The latest edition of the IAB-Tage “Beton” (IAB Concrete Days) held on 9 and 10 November 2022 in Weimar dealt with key topics that will determine the future of the construction sector. About 150...

more
Issue 02/2023

Method for producing a composite element as well as composite element

(10) WO 2022/232851 A1(22) 07.05.2021(43) 10.11.2022(57) The invention relates to a method for producing a composite element (1). According to the invention, in order to efficiently produce a...

more
Issue 02/2023

Refined prestressed concrete elements

(10) US 20220356703A1(22) 25.07.2022(43) 10.11.2022(57) Disclosed invention comprises innovations in the fabrication process and the associated design methodology for producing refined prestressed...

more
Issue 02/2023

CO2 Impregnated Concrete

(10) US 2022/0356115 A1(22) 25.04.2022(43) 10.11.2022(57) Concrete made using the protocol described herein converts more of the available calcium hydroxide (Ca(OH)2) into calcium carbonate (CaCO3)...

more
Issue 02/2023

Lift assembly for blocks and method of lifting blocks

(10) CA3126767 (A1)(22) 04.08.2021(43) 13.11.2022(57) Lifting apparatus for lifting, conveying and/or positioning blocks or slabs, such as blocks or slabs made of concrete, masonry, stone, brick, or...

more
Issue 02/2023

Reinforced concrete pile

(10) EP 4 092 197 A1(22) 12.05.2022(43) 23.11.2022(57) A reinforced concrete pile (1, 1’), which can be driven into the ground for supporting a building or the like structure, comprises at least one...

more
Issue 02/2023

Concrete box girder inside formwork and inside formwork system

(10) DE 20 2022 105 416 U1(22) 27.09.2022(47) 17.10.2022(57) Betonkastenträger-Innenschalung, dadurch gekennzeichnet, dass sie eine erste Innenschalungsbaugruppe (1) und eine zweite...

more
Issue 02/2023

Electrically heated concrete panel

(10) DE 10 2022 111 048 A1(22) 04.05.2022(43) 17.11.2022(57) Aufgabe der Erfindung ist es, eine elektrisch beheizbare Betonplatte bereitzustellen, die hoch beanspruchbar ist, insbesondere eine hohe...

more
Issue 02/2023

Support device for concrete floors

(10) DE 10 2021 122 337 B3(22) 30.08.2021(45) 03.11.2022(57) Abstützvorrichtung (1) für Betondecken mit einem ersten Träger (2) und einem zweiten Träger (3), die um eine gemeinsame Schwenkachse (5)...

more
Issue 02/2023

Concrete composite wall element of at least two prefabricated forced-fitted shear walls of two or the same material and method for producing a composite wall element

(10) DE 10 2021 002 584 A1(22) 18.05.2021(43) 24.11.2022(57) Beton-Verbundwandelement aus mindestens zwei, aus unterschiedlichem oder gleichem Material vorgefertigten Wandscheiben, die kraftschlüssig...

more

Ihre Suche nach "" :

5984 Treffer in "AT Minerals"

9061 Treffer in "Bundesbaublatt"

8695 Treffer in "Betonwerk + Fertigteil-Technik"

7899 Treffer in "bauhandwerk"

1250 Treffer in "Brandschutz"

1322 Treffer in "Computer Spezial"

5608 Treffer in "dach+holzbau"

15691 Treffer in "Deutsche BauZeitschrift"

5935 Treffer in "FACILITY MANAGEMENT"

11618 Treffer in "Kälte Klima Aktuell"

6172 Treffer in "metallbau"

1722 Treffer in "recovery"

12276 Treffer in "SHK Profi"

13700 Treffer in "tab - Das Fachmedium der TGA-Branche"

12375 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2093 Treffer in "tunnel"

5808 Treffer in "Zement Kalk Gips"

3572 Treffer in "Ziegelindustrie International"