Paschal: Achieve more with Logo.3 – now with new integrated clamp mounting

 Logo.3 formwork panels with integrated clamp mounting – for optimized construction site logistics (Figure: Paschal)

 Logo.3 formwork panels with integrated clamp mounting – for optimized construction site logistics (Figure: Paschal)
At Paschal the focus is on customer wishes and needs. Along with “off-the-shelf” formwork systems, the formwork expert therefore also offers customer-specific adaptations, such as the clamp mounting for Logo connecting pieces. The resulting improvement in the construction site logistics has been so convincing that the clamp mounting has been supplied as standard with all Logo.3 large-size and midi panels since February 2019.

The number of clamp mountings attached is always adapted to the respective need for connecting pieces. For example, formwork panels with a formwork height of 270 cm have room for three wedge clamps, whilst four wedge clamps can be fastened to panels with a formwork height of 340 cm.

 

Optimized processes for formwork, storage and transport

When moving and dismantling the formwork, the connecting pieces can be placed practically on the panel and are therefore immediately available for the next location – that saves on transport and ensures shorter assembly and dismantling times. Centrally positioned on the middle crossprofile, the clamp mountings always ensure optimal accessibility from all sides – no matter in which direction panels are being formed or extended.

Formwork panels with clamp mountings can also be easily stored and transported. The mountings including “parked” clamps are flush meaning that the formwork panels can very easily be stacked.

 

 

CONTACT

Paschal-Werk G. Maier GmbH

Kreuzbühlstr. 5

77790 Steinach/Germany

+49 7832 71 237

www.paschal.com

Related articles:

Company Dosch is investing in 750 m² of new formwork

Construction Company Dosch is investing in approx. 750 m² of new Logo.3 formwork in corporate colours with customised cross profiles for connecting pieces. Like Paschal, Bau-Dosch GmbH places the...

more

Paschal with innovative lightweight formwork Neor at bauma 2019

The new Paschal lightweight formwork Neorast has been specifically developed to meet the demands of customers and current requirements in the construction industry. Another development focus was the...

more

Paschal: Formwork for the new bridge construction over the River Kinzig completed

All the concreting and formwork for the new Kinzig Bridge between Steinach and Bollenbach has now been successfully completed. The new construction will replace the old, dilapidated bicycle and...

more
2019-06

Pre-cast concrete formwork, wall system and method of construction

(11) 2567341 A (22) 26.07.2017 (43) 10.04.2019 (57) ) Formwork for building a wall system, the formwork comprising: a first pre-cast concrete wall panel and a second pre-cast concrete wall panel, the...

more
2018-04

Pre-cast concrete formwork, wall system and method of construction

(10) WO 2018/018081 Al (22) 26.07.2017 (43) 01.02.2018 (57) Formwork for building a wall system, the formwork comprising: a first precast concrete wall panel and a second pre­cast concrete wall...

more