Processing mold and preparation method of concrete sealing tank model of underground gas storage

(10) CN120190892

(22) 26.05.2025

(43) 24.06.2025

(57) The invention discloses a processing mold and a preparation method of an underground gas storage concrete sealing tank model, and relates to the technical field of underground gas storage, and the processing mold comprises an outer ring assembly, an inner ring assembly and a centering ring. The centering ring can ensure that the inner ring assembly and the outer ring assembly are concentrically arranged; the bottom of the concrete tank body model is automatically leveled through the base, the top of the concrete tank body model is flush with the upper edge of the outer ring assembly and can be naturally leveled through pouring, the inner surface and the outer surface of the concrete tank body model are formed through the inner ring assembly and the outer ring assembly, the overall flatness is good, and the model precision can be improved. The inner ring assembly and the outer ring assembly ...

(71) Shendi Science and Engineering Yunlong Lake Laboratory; China University of Mining and Technology

x

Related articles:

Issue 01/2026

Pouring mold for reinforced concrete segment prefabricated part

(10) CN119238695 (22) 25.10.2024 (43) 03.01.2025 (57) The invention relates to the technical field of reinforced concrete prefabricated tower column pouring, and particularly discloses a pouring mold...

more
Issue 06/2023

Steel prestressed concrete composite beam and pouring mold thereof

(10) CN114319718A (22) 30.09.2020 (43) 12.04.2022 (57) The invention belongs to the technical field of structural engineering, and particularly discloses a steel prestressed concrete composite beam...

more
Issue 08/2021

Concrete prefabricated floor slab with built-in energy storage tank

(10) WO 2021/089028 (22) 06.11.2020 (43) 14.05.2021 (57) Disclosed is a concrete prefabricated floor slab with a built-in energy storage tank, the concrete prefabricated floor slab comprising...

more
Issue 08/2024

Fabricated concrete stair prefabricated part pouring production equipment

(10) CN117428903 (22) 27.09.2023; (43) 23.01.2024 (57) The invention discloses assembly type concrete stair prefabricated part pouring production equipment, and particularly relates to the technical...

more
Issue 01/2026

Ultra-high performance concrete prefabricated part pouring mold

(10) CN119773035 (22) 13.03.2025 (43) 08.04.2025 (57) The invention relates to the technical field of building material production equipment, and one embodiment of the invention provides an ultra-high...