New FPC sample manual for precast concrete elements

The factory production control system consists of regular inspections and tests, documentation and availability of test results, regulations on responsibilities and powers for personnel, and steps to be taken in the event of non-compliance.
The insprection schemes contain information on:

test subject (what is being tested),

test method (how is the test performed),

test purposes (why is the test performed),

test frequencies (how often is the test performed),

responsibilities (who performs the test).

The FDB sample manual for factory production control is intended to help manufacturers of structural precast concrete elements to set up or optimize their factory production control system. The 2nd edition, published in 2025, has been completely revised, incorporating changes based on the new DIN 1045 series of standards and feedback from users.

The FPC sample manual is intended to provide responsible employees with a tool for proper documentation. The FPC sample manual is not intended to be a rigid set of rules, but rather to be adapted individually by the manufacturer.

The FPC sample manual contains the inspections and tests required by the technical regulations, supplemented by references to standards. Comments and explanations are intended to facilitate the application and implementation of the manual. The appendices list all cited standards and guidelines and contain Excel sheets for further processing.

x

Related articles:

Issue 09/2022 TESTING BLUHM & FEUERHERDT

Manual of concrete testing in its 7th edition

The manual of concrete testing/test instructions and examples - is again commercially available, now in its 7th edition. The first edition was published 50 years ago, in 1972, and has become the...

more
Issue 11/2010 New Self-compacting Filling Material for Pipeline Trenches

From the Suitability Test to Quality Assurance

According to [1], the average costs for sewer rehabilitation determined based on the figures estimating the costs for repair, renovation and renewal in 2004 amount to 540 euros per meter repaired...

more
Issue 01/2022 SONOCRETE

Sonocrete mastered first factory test with a large device

Ten months after the first factory trial, the Sonocrete team headed off again – this time with considerably larger items of luggage: the first „large“ Sonocrete equipment was put into operation at...

more
Issue 11-2015 DS Dichtungstechnik

New benchmark in sealing systems for the Hong Kong tunnel

The longest and deepest undersea highway tunnel ever built in Hong Kong will stretch between the western New Territories and Lantau Island. The building project aimed at the design and construction of...

more
Issue 01/2016

Notes on the quality testing of reinforcing steel according to DIN 488-6:2010

DIN 488-6 was published in 2010 and introduced by the building authorities a short time later with all other parts. From test results and experience in external monitoring according to...

more