Rigid connection structure between upper precast concrete column and lower precast concrete column ...

(10) US 2018/0320363 Al

(22) 08.09.2017

(43) 08.11.2018

(57  Provided is a rigid connection structure including: a lower PC column having column concrete, a lower column plate disposed on top of the column concrete, and a plurality of lower column reinforcing bars buriedly arranged vertically in the interior of the column concrete and having upper ends penetrated into the lower column plate in such a manner as to be exposed to the outside; and an upper PC column having column concrete, an upper column plate disposed on top of the column concrete, and a plurality of upper column reinforcing bars...

Related articles:

Issue 10/2025

Prefabricated reinforced concrete column beam-column connecting structure

(10) CN120042281 (22) 27.04.2025 (43) 27.05.2025 (57) The invention discloses a prefabricated reinforced concrete column beam-column connecting structure, and particularly relates to the field of...

more
Issue 08/2024

Prefabricated reinforced concrete beam-column connecting structure and construction method thereof

(10) US2024159038A1 (22) 07.11.2023 (43) 16.05.2024 (57) A prefabricated reinforced concrete beam-column connecting structure and a construction method thereof are provided. The prefabricated...

more
Issue 08/2017

Bolted column connection for seismic applications

1 Introduction The connections between precast elements play a fundamental role in the overall performance of the structure, representing a critical link where structural continuity is needed for...

more
Issue 10/2026

Mold for precast concrete member

(10) KR102989826 (22) Feb. 20, 2026 (43) Jul. 10, 2026 (57) The present invention relates to a formwork for a precast concrete element, comprising: a base plate; side walls attached to the base plate,...

more
Issue 01/2017 Peikko

New column connection for seismic-proof construction

Early precast designs showed less than perfect earthquake performance. Common reasons for the failures were inadequate detailing, poor workmanship and lack of continuity or redundancy in the...

more