Prefabricated footing for wind turbines

(11) EP 3 115 513 A1

(22) 17.02.2015

(43) 11.01.2017

(57) It is foreseen that the footing be executed in an excavation, such that a lower concrete slab (2), with its corresponding steel reinforcement, is obtained at the base of the same, and upon which a plurality of prefab­ricated partitions (3), likewise of concrete, are radially disposed in the shape of a crown at a prefabricated or executed in situ concrete zone (4), such that the spaces defined between these elements are filled with the ma­terial (5) obtained by means of the excavation, in order finally to achieve a total or partial upper...

Related articles:

Issue 08/2021

Concrete prefabricated floor slab with built-in energy storage tank

(10) WO 2021/089028 (22) 06.11.2020 (43) 14.05.2021 (57) Disclosed is a concrete prefabricated floor slab with a built-in energy storage tank, the concrete prefabricated floor slab comprising...

more
Issue 08/2023

Integrated prefabricated slab

(10) CN114197744A (22) 16.12.2021 (43) 18.03.2022 (57) The invention discloses an integrated prefabricated slab which comprises a concrete bottom plate, a plurality of longitudinal concrete ribs and a...

more
Issue 07/2010

July 2010

Issue 02/2013 Punching shear of column footings

Experimental studies

Summary Based on a research project conducted by Deutsche Forschungsgemeinschaft (DFG - German Research Foundation) that had been concluded already, ten punching shear tests were carried out on...

more
Issue 06/2022

Fibers replace reinforcement – Rapid construction with fiber-reinforced semi-precast elements

Installing conventional reinforcement is expensive and time-consuming. This process step is eliminated by using steel fiber reinforced concrete. However, in general, fibers are not used as the only...

more