PCC column foot system – anchored quickly and safely, also in frost

In time for Bauma 2016, Pfeifer will present a further-developed version of the PCC column foot system as the latest addition to the company product portfolio. The new system enables force-locked connection of columns to foundations and/or columns to beams by simply bolting the two elements together. This makes separate transport and later assembly of foundations and columns possible. Full loadbearing capacity is ensured without the need for casting or fulfilling other conditions.

Installation of anchors in the foundation is performed at the construction site or in the precast plant, whereas installation of the column feet takes place exclusively in the precast plant. Separate transport of the elements to the construction site thus optimizes meeting logistics requirements. At the site, the precast elements are then simply bolted together. The connection is instantly loadbearing, and complex support measures are not required.

Certificates of compliance in the form of official approvals and type tests enable qualified detail solutions for narrow column geometries. The very slight dimensional differences between bolt axis and column foot guarantee ideal structural engineering for efficient utilization.

Technical support for design and installation, provided by experienced Pfeifer specialists, ensures successful project execution. High quality in manufacture is guaranteed by certification according to DIN ISO 9001 and DIN EN 1090.

x

Related articles:

Issue 01/2017 Pfeifer Seil- und Hebetechnik

Innovations and system optimizations at BAU 2017

At Bau 2017 in Munich, from 16 to 21 January 2017, at stand 408 in Hall A1, Pfeifer Seil- und Hebetechnik GmbH will showcase its innovations, further developments, and system optimization products....

more
Issue 01/2014 Peikko

Precast parts for logistics hall of GVZ Ingolstadt

At the logistics center at the cargo transport center of the Ingolstadt Betreibergesell-schaft mbH (LGI), in which the German city of Ingolstadt and Audi AG participate equally, the construction of a...

more

Variable screw system: PSF column shoe system

The introduction of the stan­dards DIN 1055-4 wind loads and DIN 1045-1 reinforced concrete have increased the technical requirements in the field of structural engineering and the assembly of...

more
Issue 01/2021 SCHICK GROUP

Y-shaped precast columns contribute to construction progress of terminal 3

The overall project of implementing the new construction of terminal 3 is running at full speed. J-Pier, the largest passenger gate of the project, is also growing bit by bit. On the eastern plot of...

more
Issue 10/2013 Laumer

Slender and loadbearing

The new construction of the plant to relocate the headquarters of Fliegl Agrartechnik GmbH from Töging to Mühldorf impressively documents the development of the company into an international...

more