Berding Beton

Mobile dry weather channel for sewer rehabilitation

A major part of the German sewer network covering more than 500,000 kilometers is in most urgent need of repair, the cost of which, experts estimate, would run to roughly 50 billion euros, alone in the upcoming years.

The engineers of the municipal wastewater department in the German city of Düsseldorf recently developed in close collaboration with Berding Beton a construction of innovative interconnected concrete elements that can be lowered into the sewer through a manhole entry of only 62.5 cm diameter.

Solid construction ready for immediate load-bearing

The system is relatively easy to handle and can be installed while the sewer is in operation. Construction pits are not required and interference in the flow of traffic is limited. Each element has a T-shaped cross-section with a central web and bracket-type flanges of equal height on both sides. During installation, always two sideways adjacent elements are turned by 180° to each other and joined. The free area of the invert thus forms the new flow channel.

The individual channel elements fit into each other like the parts of a Lego system and form a continuous complex berm that can be walked and driven on immediately following installation. Due to construction of solid concrete, the elements can be arranged on the invert of the sewer without requiring any fixing.

Related articles:

Issue 2015-02 An innovative tool to increase tractive stress

Sewage flow accelerator system consisting of interlocking precast blocks

A large number of sewers run through the Düsseldorf city area and convey wastewater and stormwater to several treatment plants. Every sewer is designed for certain hydraulic parameters to prevent...

more
Issue 2014-07 Berding Beton

High-performance reinforced concrete pipes with dry weather flow channel

At present, Europe’s largest water construction site is situated in the “melting pot” Ruhr district in Germany. The river Emscher with its numerous tributaries not only represents a unique...

more
Issue 2019-02 Special corrosion protection measures

Emscher wastewater sewer

On 24 September 2018, the Emschergenossenschaft (Emscher Cooperative) commissioned the first section of the Emscher wastewater sewer. With an overall length of 51 km, the Emscher wastewater sewer runs...

more
Issue 2015-04 Reiff Beton

Separation system of high quality

On an area measuring about 7 hectares, the new industrial estate “In der Langfuhr” has been developed in the German town of Bendorf in the district of Mayen-Koblenz since the beginning of 2014. Kay...

more
Issue 2013-05 MC-Bauchemie Müller GmbH & Co. KG

Manhole rehabilitation in the focus

About 75 participants of engineering offices and network providers accepted the invitation of Prof. Dr.-Ing. Karsten Körkemeyer, chair in construction management at TU Kaiserslautern, and came to the...

more