Waibel, the medium-sized, family-run company headquartered in Gernsheim in Germany, was founded more than 70 years ago. Waibel operates and manages several plants as well as other production and port facilities with integrated sales points for sand, gravel, stone chippings, and concrete. The company performance spectrum includes, in addition, machinery and equipment for recycling used building materials, excavated earth, and bulky refuse.

Recycling solution in detail

For the Waibel-Transportbetonwerk ready-mixed concrete plant in Frankfurt (Main), a Bibko ComTec leftover-concrete recycling system was installed together with a pump discharge conveyor and adapted to local conditions.

The concrete pumps can discharge easily and without delay via the funnel of the Bibko pump discharge conveyor installed at floor level. The leftover material, consisting of residual concrete and washwater, is subsequently conveyed to the downstream recycling machine.

In order to meet the requirement for minimization of flushing time, a batching buffer 5 m in length and a 7.5-m charging hopper were provided for receiving the leftover material. At the funnel, three truck mixers can flush out simultaneously, resulting in short flushing times for each vehicle and reducing waiting times to a minimum.

The material in the batching buffer is then, likewise continuously, conveyed to the wash-out and/or recycling process itself, into the ComTec Bibko recycling plant. In the plant, which has a recycling capacity of 20 m³/h, the fines content < 0.2 mm (cohesive cement and cohesive sand) is washed out. These, together with the washwater, are then conveyed to the already existing agitator basin. Built-in agitators prevent sedimentation of the fines content in the leftover water. Washed-out material > 0.2 mm is then discharged by the ComTec spiral conveyor. The water remaining can subsequently be reused for concrete production.

Positive conclusion

The above-described concept achieves a closed material circuit. The operation of a Bibko leftover-concrete plant, in addition to its economic benefits, thus makes an active contribution to the protection of the environment as well as preservation of natural resources.

Related articles:

Residual concrete recycling system with dosing buffer: Reuse of waste water feasible

Company Warbud Beton Sp. z o.o. in Poland has placed an order with Bibko® for the fourth ComTec residual concrete recycling system including a dosing buffer. The wash-out machine ComTec 30 was...

more
Issue 05/2018 Bibko

Tönnissen invests in a new residue concrete wash-outsystem

Erich Tönnissen GmbH is a medium-sized construction company based in the city of Kleve in the Lower Rhine region of Germany. Since the company foundation more than 50 years ago, the responsibility...

more
Issue 08/2017 Bibko

ComTec residual concrete recycling system for Amos

Albert Amos GmbH & Co. KG is a company with 80 years of tradition that is headquartered in Brackenheim, near Heilbronn in Germany. With a workforce of 160, Amos is active in the sectors of building...

more
Issue 12/2014 Bibko

1,500th residual concrete recycling plant delivered

The environmental engineering and consulting company Bibko Umwelttechnik und Beratung GmbH recently delivered the 1,500th residual concrete recycling plant in its company history. The plant was set...

more
Issue 11/2012 Bibko Umwelttechnik & Beratung GmbH

Residual concrete recycling in Southern Russia

When the newly constructed precast plant in the Russian city of Shakhty was officially commissioned at the end of September 2012, this was also a milestone in the successful history of Bibko...

more