SUBMITTED BY: WECKENMANN

Innov.: System for creating precast concrete ceilings

Concrete ceilings will deform over time due to their own weight and payload. Weckenmann announced a new system, which creates a targeted camber on concrete ceiling elements. The procedure leads to two different results. Firstly, the deflection of the ceiling is reduced as well as the amount of needed material. Secondly, a flat soffit without a vertical offset is created. The latter is possible since the elements get placed horizontally and with no deflection whatsoever. The camber is placed in a predefined radius. Therefore, the camber is chosen to approach the deformation caused by the load case. To avoid the need of specific formwork tables with preinstalled formwork superelevation, the precast ceilings are formed, concreted, reinforced and compacted on flat pallets. Subsequently, the pallets arrive in the curing chamber where they get bent by adjusting the support rollers. The concrete assumes its shape and cures. After achieving its final strength, the pallets’ superelevation will be undone, and the ceiling elements will be taken off the pallet.

Contact

Weckenmann Anlagentechnik GmbH & Co. KG

Birkenstraße 1

72358 Dormettingen/Germany

+49 7427 9493-0

www.weckenmann.de

x

Related articles:

Issue 03/2020 WECKENMANN ANLAGENTECHNIK

Foundation stone for digitised pallet circulation system

In June 2019 Weckenmann Anlagentechnik GmbH & Co. KG were awarded the contract from EMC European Modular Construction GmbH to supply a state-of-the-art precast concrete plant. Weckenmann has been...

more
Issue 08/2011 Against corrosion

Weckenmann protects formwork profiles before leaving the factory

A high and lasting corrosion protection with a high level of resistance to solvents and acids, offers the new corrosion protection system KS from Weckenmann, that has specifically been designed for...

more
Issue 05-2022/2022 WECKENMANN

New hall with second pallet circulation system for double-wall and slab element production at Rector Lesage

The company Rector Lesage began in 2018 to establish a production unit in order to increase its production capacity and to extend its product range by adding double walls. This plant now ensures...

more
Issue 01/2019 WECKENMANN ANLAGENTECHNIK

Keegan Precast adds to portfolio with a new pallet circulation system

The established precast concrete manufacturer Keegan Precast Ltd., with a workforce of more than 120, rises to the requirements of the market in Ireland and Great Britain with another state-of-the-art...

more
Issue 09/2014

Optimized pallet flow and performance ­increase of more than 15 %

What began with an initial talk between the Managing Director Karl-Josef Fassnacht of ZW Arnach and Hermann Weckenmann of Weckenmann Anlagentechnik GmbH & Co. KG in April 2013 at the trade fair...

more