Building fast and in a resource-efficient manner is a challenge of our times. It is imperative to minimize disruptions in infrastructure and CO2 emissions because of construction activities. In the context of the Priority Program 2187 “Adaptive modularized
construction made in a flux – precise and rapid building of the future” funded by the German Research Foundation (Deutsche Forschungsgemeinschaft, DFG), approx. 60 researchers have been working on solutions for this purpose since 2020 [1]. Therefore, individual load-bearing structures are divided into modules, industrially prefabricated, and just have to be assembled on site following the Lego principle. The prefabrication of the modules takes place in a quality-assured manner, using lean production methods.

The segmentation of the load-bearing structures into modules leads to the fact that inaccuracies can superimpose each other, such as deviations in the geometry of the individual modules, overlapping in favor of the overall load-bearing structure. This effect is intensified
by the number of modules being used for a structure. The figure
illustrates this, using the example of an arched structure, by means of a stochastic evaluation of the deviations in mean value and standard deviation subject to the number of modules. The modules tend to be assumed too small. As countereffect, a high accuracy of the modules is required or a compensation of the deviations by a purposeful
arrangement of the modules (“too short compensates too long”).

Current developments in the context of the SPP are first implementations of prototypes consisting of automatically manufactured similar modules as well as interdisciplinary benchmarks. The latter include feasibility studies of the modular segmentation for bridge support structures, in which different module and joining concepts are combined so as to result in the bridge design; integrated planning in building constructions, being derived from a holistic digital representation of a specific modular building construction project; as well as process-related quality assurance close to real time and with large-scale tomography, by investigating the quality control of the internal structure and external shape of modules as an in-line process.

x

Related articles:

Issue 02/2021

Building fast with serial-produced construction elements – Priority Program 2187

The future belongs to rapid construction. To enable this, structural construction elements must be entirely prefabricated. They must be light and their quality ensured. All that would need to take...

more
Issue 08/2023

Prefabricated structure and prefabricated module

(10) EP4183946A1 (22) 18.11.2022 (43) 24.05.2023 (57) A prefabricated structure (1) comprising at least two prefabricated beams (3) each mainly extending in a first substantially horizontal beam...

more
Issue 06/2022

Lightweight, prestressed carbon-reinforced concrete floor slabs – New perspectives for the precast industry

Since the 1930s, numerous prestressed thin-walled building elements, prestressed both with and without bond, have been used in construction worldwide. Examples range from buildings with simple slab...

more
Issue 12/2021 FBF BETONDIENST

Industry congress focuses on resource-efficience

“Building more sustainably with concrete” is the heading under which the 66th edition of the BetonTage congress will take place from 22 to 24 February 2022 at Congress Centrum Ulm/Hotel Maritim. The...

more
Issue 02/2020 Mastering the rheology of fresh concrete

Opus Fluidum Futurum – Report from the DFG Priority Program 2005

The processing of cement-based building materials is at the technological core in the construction and maintenance of structures. Although formability in the fresh state offers almost unlimited...

more