Adjustable system for embedded union of prefabricated concrete elements for building structures, and method for performing the union

(11) EP 2 559 817 A3
(43) 20.02.2013
(22) 14.08.2012
(71) Prefabricados Dinescon, S.L., 31395 Barasoain (Navarra) (ES)
(57) The present invention relates to an adjustable embedded joint system of prefabricated concrete elements for building structures and to a process to carry out said joint, wherein the adjustable joint system comprises at least two prefabricated reinforced concrete blocks, an upper prefabricated block and a lower prefabricated block that join vertically by means of a bushing that joins a steel reinforcing bar of the upper prefabricated block with a steel reinforcing bar of the...

Related articles:

Issue 2013-09

Prefabricated building block for assembling well wall

(10) WO 2013/078732 A1 (22) 14.12.2011 (43) 06.06.2013 (71) JIANG, Yun) [CN/CN]; Jiangsu 213300 (CN) (57) A prefabricated building block for assembling a well wall, the prefabricated building block is...

more
Issue 2019-07

Prefabricated floor element, structure comprising prefabricated floor elements ...

(11) EP 3 486 392 Al (22) 12.03.2018 (43) 22.05.2019 Bulletin 2019/21 (57) Prefabricated floor element (1) having an elongated shape wherein a longitudinal direction (X), a trans­versal direction...

more
Issue 2016-07 (10) WO 2016/071847 Al

A joint between beam elements and column ­elements made of prefabricated reinforced ­concrete

(10) WO 2016/071847 A1 (22) 04.11.2015 (43) 12.05.2016 (57) A joint between beam elements (T) and column elements (C) made of prefabricated rein­forced concrete, basically comprises: a portion...

more
Issue 2019-11

Prefabricated floor element, structure comprising prefabricated floor elements and installation ...

(10) WO 2019/175196 A1 (22) 12.03.2019 (43) 19.09.2019 (57) Prefabricated floor element (1) having an elongated shape wherein a longitudinal direction (X), a transversal direction (Y), a height...

more
Issue 2017-03

Prefabricated footing for wind turbines

(11) EP 3 115 513 A1 (22) 17.02.2015 (43) 11.01.2017 (57) It is foreseen that the footing be executed in an excavation, such that a lower concrete slab (2), with its corresponding steel reinforcement,...

more