A process for manufacturing prefabricated ­concrete insulated panels and panel obstained thereby

(11) EP 3 192 632 A1

(22) 04.01.2017

(43) 19.07.2017 Bulletin 2017/29

(57) A process for manufacturing prefabricated infill panels of the „thermal break“ type for the building industry in a formwork (24), comprising a step of forming a borne layer (10) by way of casting concrete in the formwork provided with a reinforcement (28) on the bottom, laying thermal insulating strips (16A) above the casting and against its respective wall of the formwork (24), arranging connection means (18) partially buried and partially projecting from the borne layer (10) for anchoring to a bear­ing layer (12), positioning thermal insulating slabs (16B) to cover an upper surface of the borne layer (10), arrang­ing lightening blocks (15), if any, casting concrete for ob­taining the bearing layer (12) provided with a respective reinforcement net and irons, vibrating the concrete and, finally, taking the panel out of the formwork (24).

(71) Logica Pannelli S.r.l. 26041 Casalmaggiore (CR) (IT)

(84) Designated Contracting States:AL AT BE BG CH CY CZ DE DK EE ES Fl FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

Designated Extension States: BA ME

Designated Validation States: MA MD

Related articles:

Issue 08/2017

Formwork for manufacturing a concrete structure, formwork system for forming such a formwork and method for manufacturing ...

(10) WO 2017/072703 Al (22) 27.10.2016 (43) 04.05.2017 (57) Formwork for manufacturing a concrete structure (2,16) which is composed of one or several folding portions (13), provided with one or...

more
Issue 10/2017

Prefabricated concrete surface foundation system for photovoltaic and thermosolar plants …

(11) EP 3 184 698 Al (22) 20.08.2014 (43) 28.06.2017 Bulletin 2017/26 (57) Foundation system for the implementation of thermosolar and photovoltaic plants that comprises a component (1) made from...

more
Issue 06/2019

Pre-cast concrete formwork, wall system and method of construction

(11) 2567341 A (22) 26.07.2017 (43) 10.04.2019 (57) ) Formwork for building a wall system, the formwork comprising: a first pre-cast concrete wall panel and a second pre-cast concrete wall panel, the...

more
Issue 04/2018

Pre-cast concrete formwork, wall system and method of construction

(10) WO 2018/018081 Al (22) 26.07.2017 (43) 01.02.2018 (57) Formwork for building a wall system, the formwork comprising: a first precast concrete wall panel and a second pre­cast concrete wall...

more
Issue 05/2018

Ultrathin concrete composite pipe with oriented and localized fiber

(11) EP 3 290 176 Al (22) 26.07.2017 (43) 07.03.2018 Bulletin 2018/10 (57) A concrete layer having an upper surface and a lower surface, a first fiber layer having longitudinally oriented (102) and...

more