(10) WO2022/252754A1
(22) 17.03.2022
(43) 08.12.2022
(57) A prefabricated assembly and cast-in-place concrete combined wind turbine foundation, comprising a prefabricated assembly part and a...
Latest-generation Teka turbine mixers
Within just four years from 2018 to 2022 the total production capacity for precast products was to be increased fivefold: This was the goal set by French...
(10) US 2013/0025229 A1
(22) Jan. 27,2011
(43) Jan. 31,2013
(57) A wind power plant tower segment is provided. The tower segment is designed as a jacket segment and comprises a reinforced concrete...