Related articles:

Issue 07/2022

Concrete connector body for an offshore wind turbine

(10) 2028088 (22) 28.04.2021 (43) 03.11.2021 (57) Offshore structure that is provided with a supporting system with one, two, three or more suction buckets (1) to be installed in the seabed, which...

more
Issue 01/2024 COMBILIFT

Monaghan based manufacturing firm celebrates 25 years with three new product launches

Combilift, one of the largest global manufacturers of multidirectional, articulated forklifts and straddle carriers, today announced its move into the offshore wind sector with the launch of a new...

more
Issue 05/2017

Precast concrete elements for the energy transition – Part I: wind power plants

Since the introduction of the Renewable Energy Source Act (EEG) in 2000, there is the political intention in Germany to join climate protection and energy politics through the specific expansion of...

more
Issue 06/2013 Max Bögl

Bauma Innovation Award winner

Serving every three years as a platform for numerous new and further developments, Bauma is the innovation driver for the international construction equipment, building materials and mining machinery...

more
Issue 03/2018

Precast Concrete Components for the Energy Transition – Part III: Hydropower

In Germany, water power (hydropower) is almost exclusively used to generate electricity. About 3.5 % of Germany‘s annual gross power generation is produced in hydroelectric power plants. This is most...

more