The building H7 at the city port in Münster, Germany, extends between the organic cheese plant and the company grounds of Cronos GmbH. The 7-story hybrid-construction building is the highest building...
(10) WO 2018/065524 Al
(22) 05.10.2017
(43) 12.04.2018
(57) Construction element (1) for a steel/reinforced-concrete hybrid beam comprising a metal girder (10) of U-shaped cross a section, formed of a...
Over the past few years, building regulations have become more open to constructions and surfaces made of combustible materials such as timber. From a fire safety perspective, however, load-bearing...
Modern buildings must increasingly ensure that technical installations be accommodated in the available intermediate floor space. Precast prestressed concrete beams can be used as an alternative to...
Reinforced-concrete beams are widely used in building construction and civil engineering. They often have full rectangular cross-sections which is advantageous for both the simple production on site...