Related articles:

Issue 10/2011 Stair landing and exterior corridor decoupling

Shear force dowel Egcotritt for highest demands on impact sound insulation

The reduction of the impact sound is a great challenge when planning and constructing a residential project. The shear force dowel Egcotritt of Frank provides a solution for the acoustic decoupling of...

more

ESP Dowel Connector for insulated and ventilated cladding panels

The ESP Dowel Connector of Edilmatic S.r.l. is a new connection system for the assembly of sandwich cladding panels. The anchor is suitable for both multilayer and ventilated elements with thermal...

more
Issue 11/2021

Topping slab installation methodology

(10) US 2021/0246657 Al (22) 07.02.2020 (43) 12.08.2021 (57) A method of laying one or more concrete topping slabs over an existing concrete structure includes providing a concrete form defining an...

more
Issue 04/2018 SUBMITTED BY/EINGEREICHT VON: NEVOGA

Innovation: Nevosafe TS protective strip for securing ­reinforcement

Nevoga AG, based in Freilassing, Germany, has developed a protective strip for securing projecting reinforcement: for example, during transport and storage of precast elements and of loadbearing...

more
Issue 01/2023

Precast building panel

(10) US 2022/0316210 A1 (22) 05.08.2020 (43) 06.10.2022 (57) A method of constructing a reinforced concrete floor structure or wall structure, including: fabricating a precast panel substantially from...

more